My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - (Item 18) - Construction Contract with Vido Samarzich, Inc.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/23/2024 Adjourned Regular and Special SA
>
Item 13 - (Item 18) - Construction Contract with Vido Samarzich, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 3:54:41 PM
Creation date
9/23/2024 9:11:26 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
9/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.20-6965, ATP 5063(196) - STANDARD AVE BIKEWAY I -ROM WARNER AVE TO 2Nn 5T <br />PROTECT NO, 20-6962, ATP 5063(199) MCFADDEN AVE BIKEWAY FROM IiARBOR BLVD TO GRtm AVE <br />PROJF.C"I' NO.23-6767 - STANDARD AVE PAVEMENTREHABILITA FION FROM WARNER AVE TO 2tt' ST <br />I'ROJEC f NO.2'3-6705 - MC'I'A])f)F;N AVh PAVEMf',N-I' RI=.HABILI'rATION FROM HARBOR BLVD TO FAIRVIEW ST <br />PROJECT NO. 0-6923 • MCFADDEN AVE PAVEMFN'I' REHABILICAT'ION FROM FAIRVIEW ST TO RAITT ST <br />PROTECT NO.23-006 - MCFADDEN AVE PAVEMENT REHABILITATION FROM RAFfT ST TO GRAND AVE <br />Item <br />Description <br />Qty <br />unit <br />ITnit Price <br />Amount <br />85 <br />TRAFFIC SIGNAL <br />I <br />LS <br />$ <br />s <br />MODIFICATION — MCFADDEN <br />AVE & CENTER STREET <br />78,000,00 <br />78,000.00 <br />86 <br />TRAFFIC SIGNAL <br />I <br />LS <br />S <br />w <br />MOD] FICATION —MCFADDEN <br />97,000-00 <br />97,000-00 <br />AVE & RAITT STREET <br />87 <br />TRAFFIC SIGNAL <br />I <br />LS <br />k <br />MODIFICATION--MCFADDEN <br />61,050-00 <br />61,050-00 <br />AVE & PACIFIC AVE <br />88 <br />TRAFFIC SIGNAL <br />1 <br />LS <br />$ <br />MODIFICATION—MCFADDEN <br />25,000.00 <br />25,000.00 <br />AVE & BRISTOL STREET <br />89 <br />TRAFFIC SIGNAL <br />1 <br />LS <br />S <br />MODIFICATION — MCFADDEN <br />274,000.00 <br />274,000,00 <br />AVE & SHELTON STREET <br />90 <br />TRAFFIC SIGNAL <br />I <br />LS <br />$ <br />MODIFICATION — MCFADDEN <br />14,500.00 <br />14,500-00 <br />AVE & FLOWER STREET <br />$ <br />5 <br />91 <br />TRAFFIC SIGNAL <br />1 <br />LS <br />MODIFICATION —MCFADDEN <br />132,000-00 <br />132,000.00 <br />AVE & BROADWAY STREET <br />S <br />s <br />92 <br />TRAFFICSIGNAL <br />1 <br />LS <br />MODIFICATION — MCFADDEN <br />71, 500.00 <br />71,500.00 <br />AVE & MAIN STREET <br />93 <br />TRAFFIC SIGNAL <br />I <br />LS <br />% <br />$ <br />MODIFICATION — MCFADDEN <br />163,000.00 <br />163,000.00 <br />AVE & ORANGE AVE <br />94 <br />TRAFFIC SIGNAL <br />I <br />LS <br />S <br />5 <br />MODIFI CAT]QN — MCFADDEN <br />120,000.00 <br />120, 00 0.00 <br />AVE & MAPLE STREET <br />95 <br />TRAFFIC SIGNAL <br />I <br />LS <br />$ <br />S <br />MODIFICATION —MCFADDEN <br />72,600.00 <br />72,600.00 <br />AVE & HAI'HAWAY STREET <br />96 <br />TRAFFIC SIGNAL <br />1 <br />LS <br />k <br />MODIFICATION — MCFADDEN <br />74,000.00 <br />74.000.00 <br />AVE & GRAND AVE <br />97 <br />MODIFYING RRFB SYSTEM <br />I <br />LS <br />$ <br />$ <br />(OAK ST MIDBLOCK <br />4,000.00 <br />4,000.00 <br />CROSSING) <br />98 <br />FURNISH A,ND INSTALL <br />73 <br />EA <br />$ <br />5 <br />TRAFFIC LOOPS <br />575.00 <br />41,975,00 <br />99 <br />INSTALL NO.6 PULLBOX <br />164 <br />EA <br />$ <br />$ <br />1,000.00 <br />164,000.00 <br />100 <br />INSTALL NO, 6E PULLBOX <br />22 <br />FA <br />$ <br />1,200.00 <br />26,400-00 <br />101 <br />INSTALL 3" PVC CONDUIT <br />9,530 <br />LF <br />$ <br />S <br />89.00 <br />848,170.00 <br />P-7 of P-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.