My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - (Item 18) - Construction Contract with Vido Samarzich, Inc.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/23/2024 Adjourned Regular and Special SA
>
Item 13 - (Item 18) - Construction Contract with Vido Samarzich, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 3:54:41 PM
Creation date
9/23/2024 9:11:26 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
9/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT N0. 20-6965. A'rP 5063(196) -STANDARD AVE BIKEWAY FROM WARNER AVE TO 2Nn ST <br />PROJECT NO.20-6962. ATP 5063(198) MCTADDEN AVE BIKEWAY FROM HARBOR BLVD TO GRAND AVE <br />PROJECT NO.23-6707 STAMI]ARD AVE PAVEMENT REHABILITATION FROM WARNER AVE TO 2' ST <br />PROJl,;C7' NO.23-h705 MC ADDEN AVh 1'AVFiM 1;NT' R}.HABILI'fAi*ioN FROM HARBOR BLVD TO FAIRVIEW ST <br />PROJECTNO. 19-6923 MCFADDEN AVE PAVEMENT REHABILITATION FROM FAIRVIEW ST TO RAITT ST <br />PROJECT NO. 23-6706 - MCFADDE:N AVE PAVEMENT RE-IIAI31LITATION FROM RAI'fT ST TO GRAND AVE <br />Item <br />Description <br />Qty <br />Unit <br />ilnit Price <br />Ammint <br />118 <br />CONSTRUCT 12" GATE VALVE <br />I <br />LS <br />S <br />S <br />C.S.A. STD PLAN NO, 1410. <br />REPLACE 50' WATER MAIN <br />45,000,00 <br />45,000.00 <br />BETWF.FN OLD AND NEW <br />VALVE LOCATION WITH PVC <br />PIPE. CONNECT TO EXISTING <br />PIPE PER C.S.A STD PLAN NO. <br />1409 <br />119 <br />ABANDON EXISTING GATE <br />I <br />LS <br />5 <br />S <br />VALVE. REMOVE VALVE BOX <br />FRAME AND COVER, CUT OFF <br />3,500.00 <br />3,500.00 <br />RISER 18" BELOW GRADE. <br />BACKFILL WITH SAND. <br />COMPACT AND REPAVE <br />120 <br />REMOVE AND DISPOSE <br />1 <br />LS <br />S <br />S <br />EXISTING GATE VALVE <br />8,000.00 <br />8,000.00 <br />121 <br />CONSTRUCT 6" ROLLED CURB <br />j 64 <br />LF <br />S <br />S <br />PER DETAIL ON SHEET DD-26 <br />120.00 <br />7,680,00 <br />TOTAL BASE BID <br />$ 17,77$ 714 50 <br />ADD ALTERNATE NO, I <br />23-670S VICFADDEN AVE. PAVEMENT REHABILITATION FROM HARBOR BLVD TO FAIRVIEW ST. <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />122 <br />II NC LA SSIFIE❑ EXCAVATION* <br />490 <br />CY <br />S <br />225.00 <br />108,000.00 <br />123 <br />COLD PLANE EXISTING <br />141.700 <br />SF <br />S <br />S <br />ASPHALT CONCRETE <br />PAVEMENT (2" MAX) <br />0.85 <br />S <br />120,445.00 <br />S <br />124 <br />COLD PLANE EXISTING <br />67,600 <br />SF <br />ASPHALT CONCRETE <br />PAVEMENT (> 2" ) <br />2 25 <br />152,10D.00 <br />125 <br />CONSTRUCT ASPHALT <br />2,800 <br />TON <br />S <br />S <br />RUBBER IIOT MIX (TI,IIC�{NESS <br />220.00 <br />616,000.00 <br />PER PLAN)* <br />126 <br />CONSTRUCT ASPHALT <br />1,540 <br />TON <br />S <br />5 <br />CONCRETE PAVEMENT* <br />175.00 <br />269,500.00 <br />P-9 of P-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.