My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - (Item 18) - Construction Contract with Vido Samarzich, Inc.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/23/2024 Adjourned Regular and Special SA
>
Item 13 - (Item 18) - Construction Contract with Vido Samarzich, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 3:54:41 PM
Creation date
9/23/2024 9:11:26 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
9/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJF.CI NO. 20-6965, All) 5063(196) - STANDARD AVE BIKEWAY FROM WARNER AVE TO 2" 5T <br />PROJECT NCI.2a-6962, A'n' 5063(l98) MCFADDEN AVE BECEWAY FROM HARBOR RLVD TO GRAND AVE <br />PmE:CT NO. 23-6707 -• STANDARD AVE PAVEMENT REHABILITIffl DN FROM NVARNER AVE TO 2Nr' ST <br />PROJF:L'T N0. 23.6705 MCFADDEN AVI,: PAVI ME?N'I' RFHAB]LITATION FROM HARBOR BLVD TO FAIRVIEW ST <br />PROJECT NO. 19-6923 - MCFADDEN AVE PAVEMFN7' REHABILFfATION FROM FAIRVIEW ST TO RAITT ST <br />PROJECT NO. 23-6706 -- MCFADDEN AVE PAVEMENT REHABILITATION FROM RAFFT ST TO GRAND AVE <br />Item Description Qty unit 71nit Price Amount. <br />'I OTAL ADD ALTERNATE NO. 2 BID ' 4,091,740.00 <br />TOTAL BASE BID + ADD ALTERNATE ERNATE NO. t <br />S 19,170,059.50 <br />TOTAL BASE BID + ADD ALTERNATE NO, 2 <br />$ <br />21, 870,454.50 <br />TOTAL BASE BID + ADD ALTERNATES NO, 1 & NO.2 <br />S <br />23, 261, 799, 50 <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />** Contractor shall coordinate with the City if additional days are required for the project. <br />t This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within a prodect total maximum number of 350 working days total construction phase <br />completion J 5 totalphases) and 30 workin y, days maximuni for UPRR phase coin p letion as shown <br />in special provisions section 3.02 "Project Phasing and Lane Requirements" after the <br />commencement date stated in the Notice to Proceed. Upon issuance of the Notice to Proceed, <br />Contractor shall immediately place order for long -lead time items (i.e. traffic signal equipment). <br />The Contractor shall submit a construction schedule within ten (10) working days from the date of <br />award of contract, which shall include the lead-times for any item requiring long lead-times. The <br />liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard <br />P-12 of P-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.