My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - (Item 18) - Construction Contract with Vido Samarzich, Inc.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/23/2024 Adjourned Regular and Special SA
>
Item 13 - (Item 18) - Construction Contract with Vido Samarzich, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 3:54:41 PM
Creation date
9/23/2024 9:11:26 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
9/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 4 <br />COST ANALYSIS <br />CONSTRUCTION OF PROJECT NOS.: 20-6965 Standard Ave Bikeway from Warner <br />Ave to 2nd Street; 20-6962 McFadden Ave Bikeway from Harbor Blvd to Grand Ave; <br />23-6707 Standard Ave Pavement Rehabilitation from Warner Ave to 2nd Street; 23- <br />6705 McFadden Ave Rehabilitation from Harbor Blvd to Fairview St; 19-6923 <br />McFadden Ave Rehabilitation From Fairview St to Raitt St; 23-6706 McFadden Ave <br />Rehabilitation from Raitt St to Grand Ave <br />Construction Contract <br />$ <br />19,170,060.00 <br />Contract Administration, Inspection and Testing <br />$ <br />2,462,934.00 <br />Contingencies <br />$ <br />1,917,006.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />23,550,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.