Laserfiche WebLink
Standard and McFadden Protected Bike Lanes <br />Public Works Agency <br />September 17, 2024 <br />Slide 2 <br />Project Summary <br />•PROJECT LIMITS: <br />o Standard Avenue from Warner to 2nd <br />o McFadden Avenue from Harbor to Grand <br />•SCOPE:Construction of protected bike lanes, street paving, landscaping, <br />traffic signals, signing and striping. <br />•Phasing: Per Contract, construction will be performed in 4 major phases. <br />Contractor may only work on 1 phase at a time: <br />–Phase 1: Standard from 2nd St. to McFadden Ave. <br />–Phase 2: Standard from McFadden Ave. to Warner Ave. <br />–Phase 3: McFadden Ave. from Harbor Blvd. to Bristol St. <br />–Phase 4: McFadden Ave. from Bristol St. to Grand Ave.