My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Approve Agreements with Carahsoft Technology Corp. and IK Consulting, LLC
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/01/2024
>
Item 13 - Approve Agreements with Carahsoft Technology Corp. and IK Consulting, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2024 1:42:59 PM
Creation date
9/25/2024 8:01:15 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Information Technology
Item #
13
Date
10/1/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Platform tables, may require complex field formatting and may require derived fields <br />which do not physically exist within the database. <br />Script Development — Script Repository Setup and development of up to 250 hours of scripting to <br />automate processes beyond the robust functionality that is part of the Civic Apps and system <br />functionality. <br />• Interface Development for the following: <br />o California State Licensing Board <br />o iNovah - cashiering system <br />o ERP — Lawson <br />o Laserfiche <br />o Business Tax System <br />o Infor Financials <br />o Accela GIS Configuration and setup <br />o Assistance with Selectron Interface (Selectron manages all of their own integrations with <br />Accela, IKC will act as the Accela expert to assist where needed) <br />o Assistance with Avolve ProjectDox Interface (Avolve manages all of their own integrations <br />with Accela, IKC will act as the Accela expert to assist where needed) <br />• Interface Configuration Documentation — Interface configuration documents will be provided <br />for all interfaces that are full developed by IKC or Gray Quarter staff. Selectron and Avolve both <br />manage their own integrations so any documentation would need to be provided by them. <br />• Conversion Build and Mapping —A configuration document identifying the process of conversion <br />and defining all mapping completed will be provided. <br />Step 4 Deliverables <br />• User Training — Up to 13 End User Training classes will be provided onsite. Each class may have <br />a maximum of 12 attendees. Each class will be 1.5 days in duration. <br />Sample Test Scripts — Core Team members will be provided 2 or 3 sample test scripts to use as a <br />foundation for development of their jurisdiction specific test scripts. The Project Manager will be <br />available to assist with this effort, however we find that these test scripts are the most effective <br />when full input from actual end users, who know the real time processes, take ownership of these <br />scripts. <br />• Data Conversion Runs — A total of 3 data conversion runs are part of this deliverable. <br />• Accela Citizen Access (ACA) Setup — Although the majority of the configuration of ACA will <br />occur within Step 3, the final pieces and delivery of this item will not occur until early in Step 4. <br />ACA will be configured for online searching, inspection request and record application where <br />appropriate. On line application to include a minimum of 70% shared page flows across the 4 <br />different modules. <br />Step 5 Deliverables <br />• Data Conversion Runs — The final data conversion run will occur as this deliverable and <br />documentation on the final configuration and mapping of the conversion will be provide. <br />Page118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.