Laserfiche WebLink
<br /> <br /> <br /> Proposal # P-9587 <br />The human connection between you and your technology. <br /> <br /> <br /> <br /> <br /> <br />RELEVANT EXPERIENCE <br /> Blueviolet/Lanmor Services performs small security system installations such as a single card reader installation all the <br />way to corporate security deployments that involve installations in multiple states across the nation. Lanmor has installed <br />many access controls, CCTV, and alarm systems at/for various local healthcare organizations and have become their <br />preferred security vendor. <br /> On a larger scale; we are currently working in conjunction with Sandia Laboratories and the Global Threat Reduction <br />Initiative team to upgrade the security systems at locations across the nation, which contain high levels of radioactive <br />material. We are also working with APS, a regional utility, to upgrade their security systems at multiple power plants and <br />substation locations to new federal regulations. <br /> With our vast experience and knowledge, I am completely confident that we can meet and exceed your expectations! <br /> <br />CLARIFICATION(S) <br /> <br />1) Client to provide: 110vac power as well as (1) high speed internet line at the new control panel location. <br />2) Standard manufacturer’s lead times are listed below. Lead times are subject to change due to broken machinery, <br />seasonal ebbs & flows, weather and other unforeseen circumstances outside of Lanmor’s control. These lead <br />times are based on the return of all approved submittals and all answered questions. Lead times below are <br />accurate at the time of this proposal and may vary by the time the project is awarded and submittals approved. <br /> Lanmor will not be responsible for missed schedule dates for reasons outside of our control. <br />2.1. Hollow Metal Frames 3-5 weeks. <br />Hollow Metal Doors 4-6 weeks. <br />Wood Doors 10-12 weeks. <br />Hardware 4-6 weeks. <br />3) Breaking apart ANY QUOTE will create a delay in material AND a cost add to project. <br />4) Upon approval of submittals, Blueviolet/Lanmor Services assumes no liability for changes, mistakes, or additions <br />which were not noted/redlined on the submittals. By approving the submittals, the approver acknowledges that all <br />is correct on the submittals unless otherwise noted/redlined. (if applicable). All other changes must be agreed to <br />in writing and executed by both parties. <br />5) Custom ordered materials (those that cannot be returned) must be paid for prior to Blueviolet/Lanmor Services <br />processing the order. The frames (and/or the doors) are (or are not) custom and require prepayment. <br /> <br />6) Unless otherwise noted on this proposal; the warranty period is one year for materials and ninety days for labor <br />from Blueviolet/Lanmor Services’ substantial completion of the project. Notice of a warranty claim must be <br />received by Blueviolet/Lanmor Services within the warranty period. The exclusive remedy under the warranty is <br />Blueviolet/Lanmor Services’ obligation to repair or replace any defective work, or at its election, compensate the <br />Owner or Contractor for the diminished value caused by Blueviolet/Lanmor Services’ work. <br /> <br /> <br /> <br />