My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Construction Contract with Diamond Construction
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/01/2024
>
Item 21 - Construction Contract with Diamond Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2024 11:51:26 AM
Creation date
9/25/2024 8:19:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
21
Date
10/1/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 22-1358 <br />SANTA ANA WELLNESS PLAZA <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: DIAMOND CONSTRUCTION & DESIGN <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Clearing, grubbing and demolition <br />1 <br />LS <br />$ 19,000 <br />$ 19,000 <br />2 <br />Temporary construction fence with double <br />1 <br />LS <br />$ 6,500 <br />$6,500 <br />gate set <br />3 <br />Earthwork <br />315 <br />CY <br />$ 185 <br />$58,275 <br />4 <br />Erosion control <br />1 <br />LS <br />$ 4,500 <br />$4,500 <br />5 <br />Trench Drain <br />34 <br />LF <br />$ 75 <br />$2,550 <br />6 <br />Storm drainline PVC <br />190 <br />LF <br />$60 <br />$ 1 1,400 <br />7 <br />Atrium drain <br />19 <br />EA <br />$325 <br />$ 6,175 <br />8 <br />Plumbing <br />1 <br />LS <br />$ 22, 500 <br />S22,500 <br />9 <br />Seat wall <br />26 <br />LF <br />$1038.50 <br />s27,001 <br />10 <br />Concrete pavers with concrete subbase and <br />1 <br />LS <br />$ 36,000 <br />$36,000 <br />cmb <br />11 <br />Stone paving <br />616 <br />SF <br />$ 29 <br />$ 17,864 <br />12 <br />Concrete banding <br />170 <br />LF <br />$ 25 <br />$4,250 <br />13 <br />Stabilized decomposed granite <br />2492 <br />SF <br />$ 14 <br />$ 34,888 <br />14 <br />Metal Edging <br />901 <br />LF <br />$ 17.8 <br />$16,037.80 <br />P-1 of P-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.