My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Construction Contract with Diamond Construction
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/01/2024
>
Item 21 - Construction Contract with Diamond Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2024 11:51:26 AM
Creation date
9/25/2024 8:19:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
21
Date
10/1/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana Wellness Plaza <br />October 1, 2024 <br />Page 2 <br />irrigation, waterproofing, lighting, and site furnishings. The new improvements will enrich <br />the surrounding community and the visiting public by providing the plaza with new <br />amenities including game tables (such as chess boards), benches, and a fountain <br />(Exhibit 1). <br />A copy of construction plans, contracts, specifications, and all related reference <br />materials (such as The Greenbook) are available for public review at the City's Public <br />Work Agency, Central Files office located in City Hall. Concept plans are attached as <br />Exhibit 1. <br />Public Outreach and Contractor Participation <br />To provide an opportunity for local vendors to submit bids, the City notified a total of 58 <br />regional vendors via PlanetBids, many of which are Santa Ana based. Furthermore, a <br />pre -bid job meeting was conducted on June 11, 2024 for prospective bidders to clarify <br />any project related questions prior to submitting their bids. A total of six bids were <br />received. No bids were received from a Santa Ana contractor. <br />As legally required, a Notice Inviting Bids was advertised in the Orange County Register <br />newspaper on June 6 and June 11, 2024. The project was also advertised in PlanetBids <br />from June 5 through June 26, 2024. Bids were received electronically via PlanetBids <br />and opened on June 26, 2024. Bids are valid until November 28, 2024. No bid protest <br />was submitted by any of the bidders during the bid protest period. <br />Bid Results Summary <br />Rank <br />Bidder's Name <br />Location <br />Base Bid <br />1 <br />Diamond Construction & Design <br />La Habra, CA <br />$746,929 <br />2 <br />Axiom Group <br />Los Angeles, CA <br />$897,717 <br />3 <br />C.S. Legacy Construction, Inc. <br />Walnut, CA <br />$1,065,028 <br />4 <br />Aguilar & Calderon Corporation <br />Whittier, CA <br />$1,098,998 <br />5 <br />The Nazerian Group <br />Encino, CA <br />$1,244,123 <br />6 <br />MBC Enterprises, Inc. <br />Westminster, CA <br />$1,356,779 <br />A total of six bids were received and all were deemed responsive. Diamond <br />Construction & Design submitted the lowest responsive base bid in the amount of <br />$746,929 (Exhibit 2). As specified in the bid documents, the lowest bid shall be <br />determined on the basis of the Base Bid. Since the contract will be below $750,000, the <br />project will not be subject to the City of Santa Ana Community Workforce Agreement <br />(CWA). Based on the bid analysis and a contractor's reference check, staff <br />
The URL can be used to link to this page
Your browser does not support the video tag.