My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Construction Contract with Elecnor Belco Electric, Inc. for the Traffic Signal
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/01/2024
>
Item 22 - Construction Contract with Elecnor Belco Electric, Inc. for the Traffic Signal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2024 11:51:10 AM
Creation date
9/25/2024 8:19:23 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
22
Date
10/1/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 24-6045 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND SPRUCE STREET <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Elecnor Belco Electric, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />BASE BID <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Traffic Signal Installation at Segerstrom <br />1 <br />LS <br />$ <br />$ C)pQ <br />Avenue and Spruce Street <br />�pO <br />fwv , <br />SO <br />2 <br />Install Video Detection System at Segerstrom <br />1 <br />LS <br />�� <br />'j� <br />4()0 <br />Avenue and Spruce Street <br />V \ <br />3 <br />Install 2" PVC Conduit <br />50 <br />LF <br />$ t ,G <br />$ C'()o <br />4 <br />*Install3" PVC Conduit <br />1200 <br />LF <br />$ <br />$ <br />5 <br />Install 4" PVC Conduit <br />600 <br />LF <br />$ <br />$ a�0 <br />i <br />6 <br />Install No. 6 Pull Box <br />9 <br />EA <br />S t7 <br />$ 0 <br />7 <br />Install No. 6E Pull Box <br />2 <br />EA <br />S r ()D <br />$ O()0 <br />8 <br />IP Communication System <br />1 <br />LS <br />$ 500, <br />$ �0Q <br />201 <br />tiG� <br />9 <br />*Install 96 Strand SMFO Cable <br />1700 <br />LF <br />$ <br />10 <br />Fusion Splice Strands of SMFO <br />96 <br />EA <br />$ <br />11 <br />Fiber Optic Splice Enclosure <br />1 <br />EA <br />$\ L�� <br />$ <br />12 <br />Remove and Construct PCC Median Nose <br />120 <br />SF <br />$ <br />(Including Steel Rebar Dowels) <br />13 <br />Signing and Striping <br />1 <br />LS <br />$� <br />P-1 of P-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.