My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Correspondence - Item 26
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/01/2024
>
Correspondence - Item 26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2024 2:34:32 PM
Creation date
9/25/2024 3:31:01 PM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Macarthur is already the de facto alternate for issues on the 405. <br />This is in an area that already has some of the busiest intersec?ons in the County. Between Thanksgiving and Lunar New <br />Year, the area is already frequently gridlocked. <br />There is a development under construc?on now at Macarthur and the 55 freeway. <br />THE VILLAGE (adjacent to this proposal, and across from South Coast Plaza) has already been presented. <br />Think what a project like this would do to the area where you live. <br />The Development Agreement must contain more mi?ga?on for the area. Remember, the owners of this property also <br />own property on the East side of Bristol. Parts of this could contain modified right turn / access -egress provisions to <br />mi?gate the issues. <br /> <br />“PUBLIC BENEFIT FUNDS” <br /> <br />$22,000,000 has been suggested for “Public Benefit”. Considering the current costs of just about everything, this is <br />absurdly inadequate. What does it cost to fully reconstruct 2 miles of Macarthur Blvd? ( Hint: roadway reconstruc?on <br />costs have been rising by 24% per year; UP 69% since December of 2020. One intersec?on, Spruce and Segerstrom, will <br />cost $800,000.00 today; what will things cost in another 2-5-10 years? )* The increase in construc?on traffic alone will <br />accelerate the need for work on Macarthur and other arterials, already in jeopardy. This will need to be done before the <br />RELATED project is fully contributory. Traffic on Flower, Sunflower, Macarthur, and Fairview will greatly increase, with a <br />need for increased maintenance. The proposed funds will be exhausted just maintaining** what we have, and nothing <br />will improve or be mi?gated. The majority of the funds proposed need to be allocated to the area that will be most <br />impacted by the development. There needs to be local ci?zen input, with full vo?ng on how funds would be used. <br /> <br />The developer has touted the economic boon (sales tax, real estate taxes / valua?on, increased economic ac?vity) this <br />will be for the City. That “largess” is in the future: 10-15 years. But the area will suffer and degrade in the interim. There <br />will be an immediate decrease in funds from businesses, and increase in infrastructure deteriora?on. The investment of <br />the Public Benefit funds in the immediate area is needed to off-set this impact, AND to ensure that the area is prepared <br />and a?rac?ve to future residents, investors, and retail customers. If this does not happen, if the funds are parsed <br />throughout the city on short-term pet projects and feel-good promo?ons, the development will not deliver the future <br />projected gains. We must maintain the long view on the investment of the area. Remember the pain, economic <br />impact, and ongoing traffic issues of the trolley? And how we were hamstrung by the County? The City needs to <br />u?lize the funds to offset the issues, an?cipated and unan?cipated, for the local area. This project impact will be an <br />order of magnitude greater in volume and dura?on; in the area that is a large (largest?) contributor to the City <br />budget. The project will undoubtedly impact that budget when we can least afford it, the next 2-6 years. <br /> <br />*h?ps://enotrans.org/ar?cle/?wa-highway-construc?on-costs-con?nued-to-grow-at-24-annual-rate/ <br /> <br />**h?ps://www.santa-ana.org/documents/dra?-2022-pavement-plan <br />“the arterial network will change from “Good” to “Fair” condi?on from FY 2022/23 to FY 2028/29 <br />…level of funding is insufficient to stabilize the backlog since the unfunded deferred M&R projects <br />will increase by 43 percent for the arterial network and increase by 35 percent for the local <br />network. <br /> <br /> <br />Pete <br /> <br />2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.