My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PREMO CONSTRUCTION, INC
Clerk
>
Contracts / Agreements
>
PROJECTS
>
PREMO CONSTRUCTION, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2024 3:06:33 PM
Creation date
10/2/2024 3:06:07 PM
Metadata
Fields
Template:
Contracts
Company Name
PREMO CONSTRUCTION, INC
Contract #
P 24-6985
Agency
Public Works
Insurance Exp Date
3/6/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 24-6985 <br />BUS STOP Il PROVEWNT PROTECT <br />TOTAL BASE BID $ 217,019.62 <br />The 'lowest responsible bidder shall be selected based. on the total base bid. The City reserves the <br />right to award the Base Bid., and any, all, or none of the add -alternate bid items (if any). <br />The quantity for this bid item is shown fan• bid comparison only. This bid item shall not he <br />subject to the "251/a" limit as stated in Section 7-35 ofthe Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly, <br />'q This bid item is considered a Specialty Item per Section 3 2 of the Standard Specifications. <br />TME FOR COMPLETION OF DMROV ;S ,A:1+11) I tt�IYli+AT7Ei! DAMAGES <br />The undersigned bidder hereby propowstoCompletedie Workfor thetotalbase bid amountshown <br />above, within Six Ell) wodci�da after the commencement date stated in the Notice to <br />Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place order for <br />long -Mead time items (Tolar Bus Shelter and Solar Power Trash Receplacles, and Benches), Work <br />shall be completed by Noveruber' t, 2024. <br />The liquidated damages amount„ in lieu ofthe annonnt speciTed in Subsection fa 9 of the Standard <br />Spedfications,'hall be $1,500 per calendar day. <br />Narrre of Firm Cman Hon Inc. <br />e , ., t r, , <br />Title _c. D <br />(If all individual, so state. Ifafinal or co-paonership, sloe the fum name and give the names of <br />all individual co-partners composing the Farm_ If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and :Massager, themor) <br />P-2 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.