My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Furniture for Main Library Renovation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/01/2024
>
Item 14 - Furniture for Main Library Renovation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 5:36:10 PM
Creation date
10/3/2024 9:46:02 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Library
Item #
14
Date
10/1/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Procurement Services <br />GSM offers a personalized inventory management and ePmcurement system) After each <br />project, our clionts will receive a complimentary online catalog of all standard products <br />(eProcure), Products may be re -ordered or simply utilized for budgeting purposes. This <br />program also boasts features to enable olther GSM housed or on -site asset management <br />electronically (eAssets). <br />GIM Installation Team <br />With over 140 In-house client service team members, GSM is equipped to successfully <br />manage delivery and installation every step of the way. <br />We ensure that all product Is delivored according to schedules and coordinated with the site <br />manager and tradespeople. We provide supervision, equipment, and all the necessary <br />permits to proceed quickly and safely. And we verify the product against the delivery tickol <br />with a commitment to clean, repair, or replace damaged product. <br />Our installation services don't just start when product is delivered. We plan the installation, <br />prepare the site, and disassemble and remove any existing furniture. If desired. we'll move <br />existing furniture and reinstall It in a new locatlon. <br />Our Installers are also Hannan Miller Cortitlod--moaning they complete a series of training <br />programs and demonstrate a thorough knowledge of installation practices. We follow <br />prescribed procedures and adhere to plans and drawings. When the product arrives, our <br />installers unpack, stage, and assemble it In compliance with the manufacturer's standards — <br />and restore the area to broom clean condition. <br />Once instal od, we check the product carefully to make sure it's level, aligned, and working <br />properly. Then we clean and polish It as instructed by the manufacturer. Even after <br />Installation Is complete, our service Isn't. We also train your people to use the product, fellow <br />up to assure you're satisfied, and make any necessary changes. <br />GIM BAn— Inlarlo nd MIJ.,0n11 <br />RFP R-ponsa farclty or Sand Ana RFP NO. 24-000A <br />Project Management <br />Our project management cycle starts with providing a Project Timeline to ensure project <br />goals are front and center, enabling us to perform milestones on time. A full-thne project <br />manager is assigned to each project and the team toilows the internal "POP" (Project <br />Organization Principles) program which keeps all MlcroTeam members on track throughout <br />the project. Key milestone checkpoints are tracked In our proprietary software at each stage <br />of the project <br />Throughout the project your GSM Project Manager wilt complete many objectives in <br />managing your project; double checking measurements, attending construction or project <br />team meetings, ensuring electrical requirements are understood, scheduling all product <br />deliveries, ensuring sufficient quantity of Installers are on duty, conducting the Punch -list <br />walks and teaching nur entire Client's staff how to adjust their new workstations, chairs, <br />orgonomic tools and lighting upon move -In. <br />If project delays are uncovered, our Project Manager will work closely with manufacturers to <br />adjust shipping dates where possible. Often times, additional costs are avoided by the close <br />monitoring of our PM's during construction meetings and site visits. <br />Tools & checklists utilized to ensure quality In project completion: <br />Project Milestones <br />Each project Is automatically outfitted with all the checklists and Information to <br />manage, track and document all major milestones for immediate retrieval during or <br />after project completion. <br />Pre -Install Checklist <br />Step by step job site readiness categories guide our team to start the project with any <br />potential obstacles accounted for. <br />Equipment Checklist <br />The GIM team will always be prepared with the proper tools to complete your job <br />smoothly and efficiently. <br />Post Doi Ivory Checklist <br />Our job is not complate just because the furniture is installed. This list ensures that all <br />aspects of the project have been addressed, from user domos to completing any <br />punch Items. <br />
The URL can be used to link to this page
Your browser does not support the video tag.