My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Furniture for Main Library Renovation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/01/2024
>
Item 14 - Furniture for Main Library Renovation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2024 9:46:54 AM
Creation date
10/3/2024 9:46:02 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Library
Item #
14
Date
10/1/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement Statement <br />A description of proposed services to be <br />provided and how they meet the needs of the <br />City as described in EXHIBIT I – Scope of <br />Services and EXHIBIT VI – Furniture <br />Specifications. <br />Tangram Shall perform services as set forth <br />by the City of Santa Ana according to Exhibit <br />I below and comply with Exhibit VI – Furniture <br />Specifications.CITY OF SANTA ANA <br />Contractor shall perform services as set forth below and per Exhibit VI Furniture Specifications. <br />1.Contractor shall provide a dedicated local representative. <br />2.Contractor shall review drawing for completeness, accuracy, and proper application of product <br />prior to installation. <br />3.Defective/Damaged Products/Missing Parts: Contractor shall notify City of defective <br />/damaged / missing part products prior to delivery and place such products on re-order. <br />Contractor shall notify City of lead time on re-ordered products. <br />4.Partial Shipments: Partial shipments will not be accepted by the City unless authorized by <br />the City. <br />5.Manufacturer/Factory Delays: Contractor shall notify City of any manufacturer/factory delays. City <br />reserves the right to cancel orders due to manufacturer/factory delays, if it is in the best interest <br />of the City. The City may elect to cancel order and seek equivalent product from another course. <br />The Contractor shall be held liable for price difference and the City may seek damages. <br />6.Missing Parts: At City’s request, Contractor shall provide usable and good quality loaner <br />furniture for City’s use until missing parts are received and successfully installed to the <br />satisfaction of the City. <br />7.Warehousing: Contractor(s) shall have the capacity to provide storage for office furniture <br />ordered by the City when a project delay occurs. The Contractor(s) must provide <br />warehousing at no cost to the City for a minimum of thirty (30) days. Please provide a monthly <br />fee (to include any associated labor) for storage costs following the 30 days on Attachment J – <br />Furniture Bid Form. <br />8.Any damage to City property incurred by Contractor will be repaired at the Contractor’s expense <br />and any repairs will not be accepted unless approved by City. <br />9.Contractor shall pre-inspect furniture for quality, damages and/or completeness or order prior to <br />scheduling delivery. <br />10.Contractor is responsible for the disposal of all packaging materials from products ordered by <br />the City off and on City site. All trash and debris must be removed and disposed each day of <br />installation in an appropriate manner. <br />11.Uncrating at location of delivery will not allowed unless authorized by City. <br />12.Furniture shall be delivered blanket wrapped, unwrapped, assembled, set in place, wiped clean <br />of all fingerprints and function demonstrated to City. <br />13.Contractor shall ensure delivery site is left in a clean and orderly manner after installation is <br />complete. <br />EXHIBIT I <br /> SCOPE OF SERVICES <br />City of Santa Ana RFP 24-080A Page 19 of 42 <br />18Tangram Interiors | City of Santa Ana
The URL can be used to link to this page
Your browser does not support the video tag.