My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Large Water Services Vault and Meter Apparatus Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/15/2024
>
Item 15 - Large Water Services Vault and Meter Apparatus Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 5:42:10 PM
Creation date
10/8/2024 4:55:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
10/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C) <br />CITY OF SANTA ANA <br />meter vault and replacing it with a new vault. In the event field conditions require, the installation <br />of water meter vaults and decks shall be as specified in City Standard Plan No. 1403D. All vaults <br />shall be recessed flush with existing pavement to avoid tripping hazards. It is the contractor's <br />responsibility to provide alternatives to the project manager. <br />It shall be the Contractor's responsibility to mobilize, deliver all materials to site, provide traffic <br />control per the WATCH manual, restore and cleanup site, and provide any incidentals required <br />to complete the work in place. <br />All water service turn offs shall be coordinated with the City and the affected resident. The <br />Contractor shall notify property owner/tenants to be affected, a minimum of 72 hours in advance <br />of work being performed. Under no circumstances shall a customer be without water <br />service for more than 4 hours. <br />CONTRACTOR RESPONSIBILITIES <br />The Contractor shall provide all labor, materials, services, and equipment necessary for the <br />completion of the work entailed as specified by the project manager, standard plans and project <br />specifications detailed herein. All work shall be in accordance with applicable trade practices, <br />workmanship, meet warranties and shall conform to all applicable laws, codes and regulations. <br />All work that cannot be completed within one day shall be steel plated and safe for pedestrian <br />or vehicular traffic. If the vault is located within a vehicle travel lane, the steel plate shall be <br />recessed to street grade. <br />Business hours are considered from 7:00 A.M. to 5:00 P.M. (Monday through Friday). Any time <br />outside of business hours of operation may be considered after hours/weekends. The Contractor <br />shall provide all necessary traffic control and obtain permits as necessary. <br />All work will be scheduled upon confirmation of scope and cost and completed within the time <br />agreed upon for each specific item of work. The Contractor may not begin work before receiving <br />a written Notice to Proceed by the City's Project Manager. All services, equipment and materials <br />provided by the Contractor must be in accordance with all applicable Federal, State and local <br />regulations, laws, and codes. <br />CITY REPONSIBILITIES <br />The City will provide access to the information in its possession and systems/software platforms <br />relevant to the preparation of the required information in the RFP. The City will provide smart <br />meters and antennas required for each location. In addition, the City will conduct field survey <br />with the Contractor and provide available as-built/record information. Selected contractors are <br />expected to perform a substantial review of the project's schedule and milestones to -date, and <br />be familiar with all software platforms and data sources being utilized. <br />FEE PROPOSAL <br />In addition to Section III.B.3 (Submittal Requirements: Fee Proposal) fee schedule shall be <br />
The URL can be used to link to this page
Your browser does not support the video tag.