My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Agreement for Children’s Interactive Exhibits for the Main Library Renovation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/15/2024
>
Item 21 - Agreement for Children’s Interactive Exhibits for the Main Library Renovation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 5:36:38 PM
Creation date
10/8/2024 4:56:09 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Library
Item #
21
Date
10/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />Contractor shall perform services as set forth below for approved conceptual designs. <br />1.Contractor shall furnish all expertise, labor, supervision, materials, equipment, and resources to <br />provide complete services for this project. The work shall be conducted in coordination and <br />collaboration with City staff, the architect, construction manager, general contractor, and other <br />stakeholders. <br />2.Attend informational meetings with the City and architect to understand the overall Library design <br />and function <br />3. Provide concept narrative and preliminary budget based on concept drawings <br />4.Prepare conceptual and final design drawings/renderings for all elements including exhibit lighting <br />and infrastructure requirements <br />5.Prepare renderings and/or models illustrating key components of the exhibits <br />6.Provide design and fabrication schedule <br />7.Provide production-ready art files <br />8.Coordinate client review of illustration art and graphic designs, including facilitation of feedback with <br />the City <br />9.Provide fabrication of exhibits, including use of materials and design that provides for longevity and <br />reasonable maintenance needs <br />10.Provide delivery and installation of exhibits and testing to ensure all exhibits function as intended <br />11.Ensure coordination of exhibits with general contractor for all construction work to be performed in <br />the Children’s Area <br />12.Provide a complete set of shop drawings for all fabricated elements and as-builts if required by <br />changes during fabrication <br />13.Provide one month or more (if needed) of storage should there be delays in facility completion after <br />fabrication begins <br />14.Provide final walkthrough inspection with City and stakeholders <br />15. Provide post installation support, long-term maintenance manuals/schedules, and warranty of <br />product <br />Note: Construction of the overall tenant improvement project is expected to be complete in March 2026. <br />Contractor should anticipate completing design by early 2025, with installation of Children’s Exhibits <br />occurring on or about January/February 2026. All dates are tentative and subject to change. <br />EXHIBIT I <br /> SCOPE OF SERVICES <br />RFP 24-107 MAIN LIBRARY CHILDREN'S EXHIBITS Page 17 of 40
The URL can be used to link to this page
Your browser does not support the video tag.