15 | 3.2 Play Boat <br />• One 2-part boat with the stern at 2'-3 7/16" wide x 4'-7 5/8" wide x 3'-4" high with painted <br />plywood and curved structure as rendered. Includes sensory wall panels. Bow to be 3'-10 1/4" <br />wide x 4'-7 5/8" wide x 5'-1/2" high with CNCed figurehead, two wheels, halo with switches, levers <br />and buttons in natural plywood. Top mast to be brown and green painted with CNCed plywood <br />construction; <br />• Two CNCed and hand-painted graphics on 1/2" ply or Apple ply. <br />Note: Does not include engineering review. If final design requires engineering review this will <br /> be handeled as a CO with costs based on the final design. <br />16 | 3.3 Burrow Ball Run Interactive <br />• Ball run Interactive budget per design; <br />• Three hand-painted graphics on 1/2" ply or Apply ply; one large graphic applied to acrylic. <br />Note: Does not include engineering review. If final design requires engineering review this will <br /> be handeled as a CO with costs based on the final design. <br />17 | 3.4 Themed End Caps <br />• Budget for buy-out HABA or similar wall panel interactives. <br />18 | 3.5 Dimensional Appliques <br />• Thirty five graphics to be CNCed and hand painted on 1/2" ply or Apple ply and mounted to <br />exhibitry. <br />19 | Site Survey <br />• Site survey to confirm existing conditions. <br />20 | Trucking <br />• Dedicated trucking including return shipment for tools and equipment. <br />• Client will be charged actuals at no mark up. <br />21 | Performance Bond <br />• Performance Bond per project requirements. <br />22 | Project Assumptions <br />• This proposal is based on project completion by the end of Q1 2026. See detailed project <br />schedule for specific completion date. Extending the project completion past this date may incur <br />labor or material escalation costs. <br />• The provided schedule is tentative and must be confirmed and aligned to the facility <br />construction schedule that currently has a March 10, 2026 completion date. This will allow for <br />Fabrication to complete in time for a coordinated installation when the facility is ready to <br />accept materials for installation. We are prepared to move the Project Completion date to align <br />with the facility construction schedule. <br />• In the event that, after Fabrication begins, there are delays in facility readiness that require <br />the exhibit materials to be stored for more than 1 month before installation, storage charges may <br />be billed to the project. <br />• This proposal includes a complete set of shop drawings for all fabricated elements and as-builts <br />if required by changes during fabrication. <br />• At the conclusion of installation, an Operations and Maintenance manual will be provided and <br />staff training as part of project closeout. <br />PROPOSAL TOTAL: <br />Proposal Total: <br />$3,600.00 <br />$13,500.00 <br />$12,500.00 <br />$0.00 <br />$70,775.00 <br />$222,450.00 <br />$4,205.00 <br />$48,750.00 <br />$852,535.00 <br /> 6900 N. Central Park Avenue, Lincolnwood, IL 60712 | P: (847) - 679 - 2800 | F: (847) - 679 - 2805 9/13/2024 | P.4