<br />ATTACHMENT B <br />2024 M2 Regional Capacity Program (Project O) Call for Projects - <br />Programming Recommendations <br />Fiscal <br />Year <br />M2 Funding <br />Engineering <br />M2 Funding <br />Right-of-Way <br />M2 Funding <br />Construction* <br />Total M2 <br />Funding <br />Estimated <br />Match <br />Total <br />Programming <br />Match <br />RateAgencyProjectFundPhase <br />Dana Point 24/25 Stonehill Drive Improvement Project1 ACE ENG $330,000 $ <br />$ <br />$ <br />$ <br />$ <br />330,000 $ <br />$ <br />$ <br />$ <br />$ <br />110,000 $440,000 <br />6,087,856 <br />1,353,485 <br />12,603,371 <br />3,153,600 <br />25% <br />Garden Grove Boulevard/Harbor Boulevard <br />Intersection Improvement2Garden Grove <br />Irvine <br />25/26 <br />25/26 <br />ICE <br />ICE <br />CON $ <br />$ <br />$ <br />$ <br />3,957,107 <br />926,065 <br />3,957,107 <br />1,015,113 <br />9,452,528 <br />2,365,200 <br />2,130,750 <br />338,372 <br />$ <br />$ <br />$ <br />$ <br />35% <br />25% <br />25% <br />25% <br />25% <br />Jeffery Road and Barranca Parkway <br />Intersection Improvements3 <br />ROW, <br />CON $ <br />$ <br />89,049 <br />24/25, Crown Valley Parkway Westbound <br />25/26 Improvement Project4 <br />ROW, <br />CONLaguna Niguel <br />Santa Ana <br />Yorba Linda <br />ACE <br />ACE <br />ICE <br />1,781,514 7,671,014 <br />2,365,200 <br />3,150,842 <br />788,400Dyer Road Improvements (SR-55 to 700' E/O <br />Pullman Street)24/25 <br />24/25 <br />ENG <br />Yorba Linda Boulevard/Savi Ranch Parkway <br />Improvements5 ROW $1,601,700 $1,601,700 $533,900 $2,135,600 <br />PROGRAMMING TOTALS $330,000 $ 3,472,263 $14,919,385 $18,721,648 $7,052,264 $25,773,912 <br />*Includes escalation of 2.6% for all right-of-way and construction projects programmed for fiscal year 2025/26. <br />Acronyms: <br />ACE - Arterial Capacity Enhancements ICE - Intersection Capacity Enhancements <br />CON - Construction M2 - Measure M2 <br />CTFP - Comprehensive Transportation Funding Programs <br />ROW - Right-of-Way <br />SR-55 - State Route 55 <br />E/O - East of MPAH - Master Plan of Arterial Highways <br />OCTA - Orange County Transportation AuthorityENG - Engineering <br />1. Applicant requested additional funding but award is reduced to reflect eligibility of items within project scope. Total project cost is $687k. The OCTA grant plus local match is listed as $440K; an additional $247k will be needed from local sources. <br />2. Applicant requested additional funding but award is reduced to reflect eligibility of items within project scope and correct match reduction. Total project cost is $6.48 million. The OCTA grant plus local match is listed as $6.08 million; an additional $548k is to come from local <br />sources. <br />3. Applicant requested additional funding but award is reduced to reflect eligibility of items within project scope. Total project cost is $1.47 million. The OCTA grant plus local match is $1.35 million; an additional $158K is to come from local sources. <br />4. Applicant requested additional funding but award is reduced to reflect eligibilty of items within project scope. The recommended grant includes a minor exception to the CTFP guidelines to allow work within 600 feet from intersection for the benefit of the MPAH to reach a <br />logical terminus on Forbes Road, south of the intersection. Total project cost is $14.5 million. The OCTA grant plus local match is $12.6 million; an additional $2.21 million is to come from local sources. <br />5. Applicant requested additional funding but award is reduced to reflect eligibility of items within project scope. The recommended grant includes a minor exception to the CTFP guidelines to allow work within a 600 feet from intersection for the benefit of the MPAH to reach a <br />logical terminus on Mirage Street. Total project cost is $2.63 million. The OCTA grant plus local match is $2.14 million; an additional $492k is to come from local sources.