My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Permanent Supportive Housing Project at 918 Bewley Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/15/2024
>
Item 18 - Permanent Supportive Housing Project at 918 Bewley Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 5:18:01 PM
Creation date
10/8/2024 4:57:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
18
Date
10/15/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT “B” <br />Project Description / Scope of Work <br />The Project includes the rehabilitation of 2 two-story residential buildings that were previously <br />utilized by The Lovers of the Holy Cross Sisters as a convent. The Developer will convert the two <br />residential buildings into eleven (11) rental units comprised of two (2) one-bedroom units, seven <br />(7) two-bedroom units, and two (2) three-bedroom units. One (1) one-bedroom unit and seven <br />(7) two-bedroom units will be restricted to homeless TAY at or below 30% of the Area Median <br />-bedroom units will be structured as shared housing for <br />homeless senior citizens at or below 50% of the AMI. One (1) one-bedroom unit will be <br />unrestricted and reserved for an on-site manager <br />as follows: <br />Bedroom Size 30% AMI <br />(PSH) <br />50% AMI <br />(PSH) Unit Total Units <br />One-Bedroom (TAY) 1 <br />Two-Bedroom (TAY) 7 <br />One-Bedroom 1 <br />Three-Bedroom (Senior) 2 <br />TOTAL 8 2 1 11 <br />will be used as office space for supportive services and programming functions. An existing <br />preschool building is also located on the Site. The Developer proposes to work with Head Start <br />to renovate and operate the preschool space. <br />As proposed, there is no enlargement of the apartment buildings and no increase in the <br />number of units as originally constructed. Moreover, the overall scope of work includes the <br />proposed conversion of an existing storage shed into an ADU with two bedrooms. <br />EXHIBIT 2
The URL can be used to link to this page
Your browser does not support the video tag.