My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - 10th Street and Flower Street Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/15/2024
>
Item 12 - 10th Street and Flower Street Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 5:41:04 PM
Creation date
10/8/2024 5:00:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
12
Date
10/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Initial Studv and Mitiaated Neaative Declaration <br />FINAL MITIGATED NEGATIVE DECLARATION <br />Lead Agency: City of Santa Ana Public Works Agency <br />Project Proponent: City of Santa Ana Public Works Agency <br />Project Location: The Project is located at the southeast corner of 10th Street and Flower <br />Street, just north of Civic Center Boulevard in the City of Santa Ana. <br />Project Description: The Proposed Project entailsthe construction ofa new approximately 1.4- <br />acre neighborhood park located at the southeast corner of 10th Street and <br />Flower Street, just north of Civic Center Boulevard. The intent of this park <br />is to provide the local communitywith accessto open space, exercise, and <br />recreation facilities. The Project components included within the park <br />concept plan consist of a basketball court, skate park, playground area <br />with rubberized playsurface, an exercise area, canvas shade structures, turf <br />play areas, new site lighting, water wise landscaping with shade trees, <br />automated irrigation system, site furnishings including benches, bike racks, <br />trash receptacles, drinking fountain and picnic tables, and a park <br />monument sign. This park would be a walk-up, pedestrian park without a <br />vehicle parking lot and would primarily serve the local neighborhood. No <br />restrooms or staff would be present. The Project also includes a zone <br />change from Professional (P) to Open Space (0). <br />Mitigation Measures Incorporated into the Project to Avoid Significant Effects: <br />Biological Resources <br />B10-1: Pre -Construction Nesting Bird Survey. If ground disturbing Project activities, tree <br />trimming, ortree removal are scheduled to occur during the nesting bird season (February 1 <br />— August 30), a qualified biologist shall conduct a pre -construction nesting bird survey to <br />ensure that active bird nests will not be disturbed or destroyed. The survey shall be <br />completed no more than 3 working days prior to initial ground disturbance. The nesting bird <br />survey shall include the Project Site and adjacent areas where project activities have the <br />potential to affect active nests, either directly or indirectly due to construction activity, noise, <br />or vibrations. If an active nest is identified, a qualified biologist shall establish an appropriate <br />disturbance limit buffer around the nest using flagging or staking. Construction activities <br />shall not occur within any disturbance limit buffer zones until the nest is deemed inactive by <br />the qualified biologist. <br />Final Mitigated Negative Declaration 1 October 2024 <br />10th and Flower Street Park Project 2023-145 <br />
The URL can be used to link to this page
Your browser does not support the video tag.