Laserfiche WebLink
Final Initial Studv and Mitiaated Neaative Declaration <br />Table 5-1. 10th and Flower Street Park Project Mitigation Monitoring and Reporting Plan <br />Monitoring <br />Implementation <br />Responsibility for <br />Outside <br />Mitigation Measure <br />Activity/Timing/ <br />Responsibility/ <br />Oversight of <br />Compliance/Coordination <br />Agency <br />Comments <br />Frequency <br />Verification <br />Verification <br />Geology and Soils Mitigation Measures <br />Activity: <br />Qualified <br />Cityof Santa Ana <br />None. <br />GEO-1: Unanticipated Discovery of <br />Evaluation of <br />Paleontologist/ <br />Paleontological Resources. If <br />potential <br />Construction <br />paleontological resources are <br />paleontological <br />Contractor <br />discovered during construction, all <br />resources by a <br />work must halt within a 100-foot <br />qualified <br />radius of the discovery and a qualified <br />paleontologist. <br />paleontologist will be retained to <br />evaluate the find. The paleontologist <br />Timing: <br />Initials <br />Initials <br />shall notifythe lead agency if the find <br />is significant. The paleontologist shall <br />During excavation <br />activities as part of <br />evaluate the significance of the find <br />and shall have the authority to modify <br />construction. <br />Date <br />Date <br />the no -work radius as appropriate, <br />using professional judgment. The <br />Frequency: <br />As necessary <br />qualified paleontologist will evaluate <br />during <br />the significance of the find and <br />recommend appropriate measures for <br />construction. <br />the disposition of the find (e.g., fossil <br />recovery, curation, data recovery, <br />and/or monitoring). Construction <br />activities maycontinue on other parts <br />of the construction site while <br />Mitigation Monitoring and Reporting Plan 5-10 October 2024 <br />10th and Flower Street Park Project 2023-145 <br />