Laserfiche WebLink
Final Initial Studv and Mitiaated Neaative Declaration <br />Table 5-1. 10th and Flower Street Park Project Mitigation Monitoring and Reporting Plan <br />Monitoring <br />Implementation <br />Responsibility for <br />Outside <br />Mitigation Measure <br />Activity/Timing/ <br />Responsibility/ <br />Oversight of <br />Compliance/Coordination <br />Agency <br />Comments <br />Frequency <br />Verification <br />Verification <br />Tribal Cultural Resources Mitigation Measures <br />Activity: <br />Construction <br />City of Santa Ana <br />Native <br />TCR-1: Monitoring Agreement. Prior to the <br />Retain a Tribal <br />Contractor <br />American <br />commencement of ground disturbing <br />monitor <br />Tribes <br />activities, the City shall extend the <br />representing the <br />entering into <br />offer to enter into a tribal monitoring <br />Gabrieleno Band <br />agreements <br />agreementwith the Gabrieleno Band <br />of Mission Indians <br />with the City <br />of Mission Indians — Kizh Nation, <br />Initials <br />Initials <br />Gabrielino Tongva Indians of <br />— Kizh Nation, <br />California, and Juaneno Band of <br />ndians of <br />Indians <br />Mission Indians, Acjachemen Nation. <br />California, and <br />The offer to execute a monitor <br />Juaneno Band of <br />agreement shall be made at least 30 <br />Mission Indians, <br />days prior to the commencement of <br />Acjachemen <br />any "ground -disturbing activity' for <br />Date <br />Date <br />Nation. <br />the subject project at all project <br />locations (i.e., both on -site and any <br />Timing: <br />off -site locations that are included in <br />Prior to <br />the project description/definition <br />and/or required in connection with <br />commencement <br />of all ground - <br />the project, such as public <br />disturbing activity <br />improvement work). "Ground- <br />within original <br />disturbing activity" shall include, but <br />ground associated <br />is not limited to, demolition, <br />with project <br />pavement removal, potholing, <br />Mitigation Monitoring and Reporting Plan 5-13 October 2024 <br />10th and Flower Street Park Project 2023-145 <br />