My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - 10th Street and Flower Street Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/15/2024
>
Item 12 - 10th Street and Flower Street Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 5:41:04 PM
Creation date
10/8/2024 5:00:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
12
Date
10/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />10th Street & Flower Street <br />Improvements <br />PROJECT CATEGORY: <br />Street Improvements <br />Traffic Improvements <br />LOCATION MAP A <br />N <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The southwest corner of Flower Street and 10th Street, currently an <br />empty lot owned by the City, is designated for the construction of a <br />new park by the PWA Parks Services Division. This park prioritizes <br />serving the local neighborhood, and may include amenities such as <br />a fitness area, basketball court, playground area, and skate park. To <br />ensure a safe and accessible intersection for the park, additional <br />street safety enhancements are necessary to support the planned <br />improvements <br />PROJECT NEED: <br />The PHB will enable pedestrians to safely cross Flower Street at 10th <br />Street, while the cul-de-sac will prevent westbound through vehicular <br />traffic on 10th Street. This project meets the intent of the funding <br />source by enhancing traffic safety for pedestrians and all road users <br />Iupon project completion. <br />PROJECT COSTS FY 24125 FY 25/26 FY 26/27 FY 27128 FY 28/29 FY 29/30 FY 30131 <br />Construction 1,698,226 - - - - - - <br />Contingency 147,672 - <br />TOTAL 1,845,898 - - <br />SOURCE OF FUNDS FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30131 <br />ARPA Funds 1,845,898 - - - - - - <br />TOTAL 1,845,898 - <br />DIVISION: <br />CIP Engineering <br />CONTACT: <br />Gilbert Castillo, Senior Engineer <br />DATE: <br />24-Sep-2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.