My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-053 - Final Supplemental for The Related Bristol Specific Plan Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2024
>
2024-053 - Final Supplemental for The Related Bristol Specific Plan Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2024 10:41:47 AM
Creation date
10/9/2024 10:31:30 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Planning & Building
Doc #
2024-053
Item #
26
Date
10/1/2024
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+CrrT1r)KI <br />ENVIRONMENTAL REVIEW AND PUBLIC PARTICIPATION <br />The Final Supplemental EIR includes the Draft Supplemental Environmental Impact Report (EIR) dated <br />July 2023, written comments on the Draft Supplemental EIR that were received during the public <br />review period, written responses to those comments and changes to the Draft Supplemental EIR, and <br />the Final Supplemental EIR Errata making minor corrections and revisions to the Final Supplemental <br />EIR. In conformance with CEQA and the State CEQA Guidelines, the City of Santa Ana conducted <br />an extensive environmental review of the Related Bristol Mixed -Use Project: <br />• The City of Santa Ana concluded that a Supplemental EIR should be prepared, and the <br />Notice of Preparation (NOP) was released for a 30-day public review period from March <br />17, 2023, through April 17, 2023. The NOP was posted at the Orange County Clerk's <br />Office on March 16, 2023. The notice was published in the Orange County Register, a <br />newspaper of general circulation. Under CEQA, a Lead Agency may proceed directly with <br />preparation of the EIR without preparation of an Initial Study if it is clear that an EIR will be <br />required (State CEQA Guidelines Section 15060[d]). The City of Santa Ana has made such <br />a determination for this Project and has not prepared an Initial Study. <br />• Completion of a scoping process, in which the public was invited by the City of Santa Ana <br />to participate. The scoping meeting for the Supplemental EIR was held on March 30, 2023 <br />at 5:30 p.m. at the McFadden Institute of Technology located at 2701 South Raitt Street in <br />Santa Ana. The notice of a public scoping meeting was included in the NOP distributed on <br />March 17, 2023. <br />• Preparation of a Draft Supplemental EIR by the City of Santa Ana, which was made <br />available for a 45-day public review period (July 6, 2023 through August 21, 20232023). <br />The Notice of Availability (NOA) for the Draft Supplemental EIR was sent to all persons, <br />agencies and organizations on the interest list interested persons, published in the July 6, <br />2023 Orange County Register, and posted at the Orange County Clerk's Office and the <br />State Clearinghouse (SCH) at the Governor's Office of Planning and Research (OPR) on July <br />61 2023. Copies of the Draft Supplemental EIR were made available for public review at <br />the City of Santa Ana, Planning Division Counter, located at 20 Civic Center Plaza, M-20, <br />Santa Ana, CA 92701, and the City of Santa Ana Public Library, located at 26 Civic Center <br />Plaza, Santa Ana, CA 92701. The Draft Supplemental EIR was also available for review <br />and download via the following City website location: https:,//www.santa-ana.org/related- <br />california-bristol-specific-plan. <br />• The Final Supplemental EIR contains comments on the Draft Supplemental EIR, responses to <br />those comments, revisions to the Draft Supplemental EIR, if any, and appended documents. <br />The Final Supplemental EIR was released for a 10-day agency review period prior to <br />certification of the Final Supplemental EIR. <br />• Pursuant to CEQA Guidelines Section 15095, staff is directed as follows: ay copy of the <br />Final Supplemental EIR and CEQA Findings of Fact shall be retained in the Project files; b) <br />copy of the Final Supplemental EIR and CEQA Findings of Fact shall be provided to the <br />
The URL can be used to link to this page
Your browser does not support the video tag.