Laserfiche WebLink
operations of the airport. The method by which the ALUC <br />achieves this purpose is through the application of the <br />objective standards contained in Section 2.1 of the AELUP. As <br />demonstrated in the ALUC staff report and, in these Findings, <br />the Specific Plan and application for each implementing project <br />is and will be consistent with each of the standards. As a result, <br />the ALUC has met their duty under Section 1.2 by ensuring that <br />the Specific Plan meets these standards. <br />e. Additionally, Section 2.1.4 of the AELUP for JWA and PUC <br />Section 21674 charge the Commission to coordinate at the <br />local level to ensure compatible land use planning. The method <br />by which the ALUC achieves this charge is through the <br />application of the objective standards contained in Section 2.1 <br />of the AELUP. As demonstrated in the ALUC staff report and, <br />in these Findings, the Project is consistent with each of the <br />standards. As a result, the ALUC has met their duty under <br />Section 2.1.4 and PUC Section 21674 by ensuring that the <br />Project meets these standards. <br />Resolution No. 2024-054 <br />