conduit, wiring, pedestrian & bike detection, signage, fiber optic <br />communication system. <br />iii. Timing of Payment: Payment to be made to the City upon issuance <br />of building permits for first development project for southerly Phase <br />(Phase 1) of the Project. <br />b. Intersection of Fairview Street at Segerstrom Avenue <br />i. Restripe to provide an exclusive WB right turn lane and eliminate <br />the existing street parking. <br />ii. Owner Proportionate Share: 2.51%. <br />iii. Timing of Payment: Payment to be made to the City upon issuance <br />of building permits for first development project for northerly Phase <br />(Phase 11) of the Project. <br />c. Intersection of Bristol Street at Segerstrom Avenue <br />i. Restripe to provide exclusive NB right turn lane <br />ii. Owner Proportionate Share: 6.70%. <br />iii. Timing of Payment: Payment to be made to the City upon issuance <br />of building permits for first development project for northerly Phase <br />(Phase 11) of the Project. <br />d. Intersection of Main Street and MacArthur Boulevard <br />i. Owner Proportionate Share: 15.65%. <br />ii. Modify the traffic signal to provide NB and SB right -turn overlap <br />phasing. <br />iii. Timing of Payment: Payment to be made to the City upon issuance <br />of building permits for first development project for northerly Phase <br />(Phase 11) of the Project. <br />e. SR-73 NB Off Ramp at Bear Street <br />i. Related Bristol Proportionate Share: 6.31%. <br />ii. Scope: Restripe the NB off -ramp to convert the existing left -turn <br />lane to a shared left/right lane. <br />iii. Timing of Payment: Payment to be to the City prior to issuance of <br />building permits for the first development project in Phase III (last <br />phase) of the Project. <br />f. Flower Street at Segerstrom Avenue/Dyer Road <br />i. Related Bristol Proportionate Share: 4.10%. <br />ii. Scope: Modify traffic signal to add left -turn signal for the NB and SB <br />directions including new traffic signal poles, controller cabinet, <br />conduit, wiring, pedestrian & bike detection, signage, fiber optic <br />communication system. <br />iii. Timing of Payment: Payment to be to the City prior to issuance of <br />building permits for the first development project in Phase III (last <br />phase) of the Project. <br />16. Plans & Standards. All public improvements will require engineered plans to be <br />approved by the Public Works Agency and permits issued for such <br />improvements. Improvements will be in conformance with City standards, rules <br />and regulations in place at time of plan approvals. <br />17. Right of Way Maintenance Agreement. Owner shall enter into a Right of Way <br />maintenance agreement, conforming to the City's standard Right of Way <br />Resolution No. 2024-055 <br />Page 14 of 27 <br />