Laserfiche WebLink
Final Initial Study and Mitigated Negative Declaration <br />Mitigation Monitoring and Reporting Plan 5-21 October 2024 10th and Flower Street Park Project 2023-145 <br />Table 5-1. 10th and Flower Street Park Project Mitigation Monitoring and Reporting Plan <br />Mitigation Measure Monitoring Activity/ Timing/ Frequency <br />Implementation Responsibility/ Verification <br />Responsibility for Oversight of Compliance/ Verification <br />Outside Agency Coordination Comments <br />agreement is reached, the <br />landowner must rebury the <br />remains where they will not <br />be further disturbed (§ <br />5097.98 of the PRC). This will <br />also include either recording <br />the site with the NAHC or <br />the appropriate Information <br />Center; using an open space <br />or conservation zoning <br />designation or easement; or <br />recording a reinternment <br />document with the county in <br />which the property is <br />located (AB 2641). <br /> Work may not resume within <br />the no-work radius until the <br />lead agencies, through <br />consultation as appropriate, <br />determine that the <br />treatment measures have <br />been completed to their <br />satisfaction. <br /> <br />  <br />  <br />City Council 12 – 72 10/15/2024