My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LOS ANGELES ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
LOS ANGELES ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 12:09:52 PM
Creation date
10/15/2024 11:19:23 AM
Metadata
Fields
Template:
Contracts
Company Name
LOS ANGELES ENGINEERING, INC. (BRISTOL ST. FROM CIVIC CENTER DR. TO WASHINGTON AVE. AND BRISTOL ST.)
Contract #
P13-6792, P15-6445
Agency
Public Works
Council Approval Date
9/17/2024
Insurance Exp Date
4/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSURANCE ON FILE <br /> WORK MAY PROCEED <br /> UNTIL►N;UR-tNCE EXPIRES CITY OF SANTA ANA <br /> 04101 f 2rs- -_.CONSTRUCTION CONTRACT AGREEMENT <br /> CITY CLERK <br /> DATE'OCT 1 5 2024 PROJECT NOS. 13-6792& 15-6445 <br /> BRISTOL STREET IMPROVEMENTS FROM CIVIC CENTER DRIVE TO WASHINGTON AVENUE AND <br /> PWR �� BRISTOL STREET(PHASE 3A)WATER MAIN IMPROVEMENTS <br /> A�`xr ar cirno Thiticfs�CONSTRUCTION CONTRACT is made and entered into this 17th day of September, 2024 by and <br /> between the City of Santa Ana,California,a charter city and municipal corporation organized and existing <br /> under the Constitution and laws of the State of California (hereinafter "CITY"), and Los Angeles <br /> Engineering,Inc. (hereinafter"CONTRACTOR"). <br /> WITNESSETH: <br /> The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows: <br /> 1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and <br /> expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction <br /> of the City Engineer of the CITY,the Bristol Street Improvements and Widening From Civic Center <br /> Drive to Washington Avenue Project(hereinafter referred to as the"WORK OF IMPROVEMENT") <br /> identified in and in accordance with the Contract Documents prepared by the City's Public Works <br /> Agency and approved by the City Council. <br /> 2. The complete Construction Contract consists of the"Contract Documents"as defined by the Standard <br /> Specifications for Public Works Construction and which include the following: <br /> • Notice Inviting Bids <br /> • Information to Bidders <br /> • Bid Proposal <br /> • Bid Bond <br /> • Contract Form <br /> • Contract Bonds <br /> • General Provisions <br /> • Special Provisions <br /> • Technical Provisions and Project Plans <br /> • Community Workforce Agreement <br /> • Appendices <br /> In case of conflict between the Contract Documents, the precedence of documents shall be as <br /> established in the Standard Specifications for Public Works Construction. <br /> 3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK <br /> OF IMPROVEMENT the sum total amount not to exceed Ten Million Five Hundred Seventy-Nine <br /> Thousand Three Hundred Fifty Dollars and No Cents($10,579,350.00), as set forth and identified in <br /> the BID PROPOSAL,which is attached hereto and incorporated herein as Exhibit"A,"and in <br /> accordance with Section 2-7.1 of the Greenbook: Standard Specifications for Public Works <br /> Construction. <br /> The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate <br /> quantities only,and the City does not expressly or by implication agree that the actual amount of <br /> rev.08/01/2023 Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.