My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LOS ANGELES ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
LOS ANGELES ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 12:09:52 PM
Creation date
10/15/2024 11:19:23 AM
Metadata
Fields
Template:
Contracts
Company Name
LOS ANGELES ENGINEERING, INC. (BRISTOL ST. FROM CIVIC CENTER DR. TO WASHINGTON AVE. AND BRISTOL ST.)
Contract #
P13-6792, P15-6445
Agency
Public Works
Council Approval Date
9/17/2024
Insurance Exp Date
4/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> i <br /> CITY OF SANTA ANA ' <br /> PROPOSAL ` <br /> PROJECT NO,: 13-6792; FEDERAL PROJECT NO.: DEMO6L-5063(146), CML 5063(21,0) <br /> BRISTOL STREET IMPROVEMENTS AND WIDENING FROM CIVIC CENTER DRIVE I <br /> TO WASHINGTON AVENUE <br /> Item Description Qty — Unit Unit Price Amount <br /> 17 Colored Concrete-Brick Red,Topcnst 1,540T SP $ $ <br /> Exposed Aggregate Finish(T=-4") 1`dt�rYU - <br /> 12 <br /> 18 Concrete Bus Pad 2,759 SF $ .- $ -"" 1 <br /> � � 687�� - <br /> 19 PCC Protected Bike Lane(6")—Detail B 2,228 LF $ $ <br /> I-I5 - 3?3%6 <br /> �20 PCC Protected Bike Lane at Bus Island(6")— 150 LF $ $ <br /> Detail F l --- 1 5e0-- <br /> 21 Furnish and Install New Water Valve Frame 7 EA $ $ ' <br /> and Cover area— /` 6x3.7 ,y <br /> 22 Furnish and Install.Survey Monument to 2 EA $ $ <br /> Finished Grade 0.abD - - 0 <br /> 23 Adjust Sewer Manhole to Finished Grade 2 EA $ $ <br /> 24 Adjust Sewer Cleanout Frame and Cover to 5 EA $ <br /> Finished Grade i7�D $(Fi'rjOPj' I <br /> I <br /> 25 Culvert Clermont Type A I EA $ 7 yob _ $ 1 <br /> 26 Traffic Signal Modification at Bristol St end I LS — $ $ <br /> Washington.Ave 2Lltwo 0 <br /> 27 Traffic Signal Modification at Bristol St and 1 LS $ $ <br /> Civic Center Dr. <br /> /25Oa — / 2-5F 0 <br /> 23 Install 2"Pvc Conduit per Pi.un 230 LF $ I <br /> 29 Install 3"PVC Conduit.pm'Plait 60 LF $ $ <br /> iT © 7 1 32 " <br /> 30 Install 4"PVC Conduit per Plan 1;250 LF $ $ <br /> _. 7 a " (33750 ' <br /> 3.1 Install No.6.Pull Box 4 BA $ <br /> :1/GD ' $T4/01.7 - <br /> 32 Install No, 6E Pull Box .. 5 EA $ <br /> 0I r h7 "" $ /0500 <br /> 33 Install Traffic Signal Loop Detector(Type E 6 EA. $ $ <br /> Loop) <br /> - 123 72 <br /> 34 Install IP Communication System l LS $ $ I <br /> 2f140jf4,50 LN-192.G,5 <br /> 35 Install 144 Strand SMFO Cable 2,500 LF $ $ <br /> 36 Install 12 Strand SMFO Cable 150 LP $ .44 — $ <br /> 1,00 <br /> 37 Fusion Splice 1 Strand SMFO 60 EA $5, s — $ <br /> 33A7.. <br /> 38 Install Fiber Optic Splice Closure I EA" $ <br /> 39 Pothole Traffic Signal Pole Location for 4 EA '$ $" <br /> Utility Conflicts -- <br /> 1 i©O — 71,00 — <br /> P-2 of P-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.