My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VIDO SAMARZICH, INC. (7)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
VIDO SAMARZICH, INC. (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 2:49:21 PM
Creation date
10/15/2024 11:35:23 AM
Metadata
Fields
Template:
Contracts
Company Name
VIDO SAMARZICH, INC.
Contract #
P20-6965, 20-6962
Agency
Public Works
Council Approval Date
9/17/2024
Insurance Exp Date
12/23/2024
Notes
P23-6707, 23-6705, 19-6923
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> PROPOSAL <br /> PROJECT NO.20-6965,AIP 5063(196)-STANDARD AVE BIKEWAY FROM WARNER AVE TO 2Nn ST <br /> PROJECT NO.20-6962,ATP 506308) MCFADDEN AVE BIKEWAY FROM HARBOR BLVD to GRAND AVE <br /> PROJECT I NO,23 6707-STANDARD AVE PAVEMENT Rl PIABILITA ION FROM WARNER AVE TO 2I'ST <br /> PROJECT N0.23-6705 MCI:AlM N AVE PAVI MENT RLIIABILII'A'l ION FROM HARBOR BIND'10FAIRVIEW ST <br /> PROJECT NO. F9 6923-MCFADDEN AVE PAVEMENT REHABILITATION FROM FAIRVIEW SIT()RAIFI'ST <br /> PROJECT NO,23-6706- MCFADDEN AVE PAV EMENT REHABILITATION FROM RAI•l?ST TO GRAND AVE <br /> Item Description Qty Unit Unit Price Amount <br /> 102 INSTALL 4"PVC CONDUIT 1,717 LF $ $ <br /> 150.00 257,550.00 <br /> 103 INSTALL,IP COMMUNICATION I LS $ $ <br /> SYSTEMS 96,700.00 95,700.00 <br /> 104 INSTALL 120 STRAND SIGNAL 2,142 LF $ $ <br /> MODE FIBER OPTIC(SMFO) 3.50 7,497.00 <br /> CABLE _ <br /> 105 INSTALL 1.2 STRAND SIGNAL 2,280 LF $ $ <br /> MODE FIBER OPTIC(SMFO) 6.00 13,680.00 <br /> CABLE <br /> 106 INSTALL 24 STRAND SIGNAL 20,000 LF $ $ <br /> MODE FIBER OPTIC(SMFO) 1.25 25,000.00 <br /> CABLE <br /> 107 FUSION SPLICE I STRAND OF 36 EA $ $ <br /> SINGLE MODE FIBER OPTIC 340,00 12,240,00 <br /> (SMFO) <br /> 108 INSTALL FIBER OPTIC SPLICE 22 EA $ $ <br /> CLOSURE 3,500.00 77,000.00 <br /> 109 POTHOLE TRAFFIC SIGNAL 72 EA $ $ <br /> POLE LOCATION FOR UTILITY 1,700.00 122,400.00 <br /> CONFLICT <br /> 110 RAILROAD;UPRR PERMIT 1 LS $ $ <br /> 15,000.00 15,000,00 <br /> Ill RAILROAD: UPRR FLAGGING 30" DAY $1,500 $45,000 <br /> 112 LANDSCAPE I LS $ $ <br /> 160,000.00 160,000.00 <br /> 113 IRRIGATION I LS $ $ <br /> 630,000,00 630,000.00 <br /> 114 120-DAY PLANT I LS $ $ <br /> ESTABLISHMENT 10,000.00 10,000,00 <br /> 115 CONSTRUCTION PERMIT 1 LS $42,319 $42,319 <br /> 116 PROJECFADVERTISEMENT 4 EA $ $ <br /> SIGN 2,000.00 8,000.00 <br /> 117 CONSTRUCT 8"GATE VALVE 1 LS $ $ <br /> PER C.S.A.STD PLAN NO. 1410. <br /> REPLACE 25'WATER MAIN 30,000.00 30 000.00 <br /> BETWEEN OLD AND NEW ' <br /> VALVE,LOCATION WITH PVC <br /> PIPE.CONNECT TO EXISTING <br /> PIPE PER C.S,A STD PLAN NO. <br /> 1409 <br /> P-8 of P-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.