My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VIDO SAMARZICH, INC. (7)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
VIDO SAMARZICH, INC. (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 2:49:21 PM
Creation date
10/15/2024 11:35:23 AM
Metadata
Fields
Template:
Contracts
Company Name
VIDO SAMARZICH, INC.
Contract #
P20-6965, 20-6962
Agency
Public Works
Council Approval Date
9/17/2024
Insurance Exp Date
12/23/2024
Notes
P23-6707, 23-6705, 19-6923
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> PROPOSAL <br /> PROJECT NO.20-6965,ATP 5063(196) -STANDARD AVE BIKEWAY FROM WARNER AVE TO 2"D ST <br /> PROJECT NO.20-6962.ATI'5063(198) MCFADDEN AVE BIKEWAY FROM HARBOR BLVD TO GRAND AVE <br /> PROJECT NO.23-6707 -STANDARD AVE PAVEMENT REHABILITATION FROM WARNER AVE TO 2N°ST <br /> PROJECT NO.23-6705 MCFADDEN AVE PAVEMENT REHABILITATION FROM HARBOR BLVD TO FAIRVIEW ST <br /> PROJECT NO. 19-6923 MCFADDEN AVE PAVEMENT REHABILITATION FROM FAIRVIEW ST TO RAITT Sr <br /> PROJECT NO.23-6706- MCFADDEN AVE PAVEMENT REI IABILITATION FROM RAUIT ST TO GRAND AVE <br /> I Description Qty Unit lln' Amount <br /> FAL ADD ALTERNATE NO. 2 BID 4,091,740.0 <br /> TOTAL BASE BID+ADD ALTERNATE NO. 1 $ 19,170,059.50 <br /> AL BASE BID+ADD ALTERNATE NO.2 $ —- <br /> ,870,454.50 <br /> TOTAI D ALTERNATES NO. 1 & . <br /> 23,261, . <br /> The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br /> right to award the Base Bid, and any, all,or none of the add-alternate bid items(if any). <br /> * The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br /> subject to the"25%"limit as stated in Section 7-3.5 of the Standard Specifications. The actual <br /> amount for this item will be dictated by the actual quantity used,and the Agency reserves the <br /> right to increase or decrease the quantity of this item accordingly. <br /> ** Contractor shall coordinate with the City if additional days are required for the project. <br /> t This bid item is considered a Specialty item per Section 3-2 of the Standard Specifications. <br /> TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br /> The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br /> above, within a project total maximum number of 350 working days total construction phase <br /> completion(5 total phases)and 30 working days maximum for UPRR phase completion as shown <br /> in special provisions section 3.02, "Project Phasing and Lane Requirements" after the <br /> commencement date stated in the Notice to Proceed. Upon issuance of the Notice to Proceed, <br /> Contractor shall immediately place order for long-lead time items (i.e. traffic signal equipment). <br /> The Contractor shall submit a construction schedule within ten(10)working days from the date of <br /> award of contract, which shall include the lead-times for any item requiring long lead-times. The <br /> liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard <br /> P-12 of P-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.