My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VIDO SAMARZICH, INC. (7)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
VIDO SAMARZICH, INC. (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 2:49:21 PM
Creation date
10/15/2024 11:35:23 AM
Metadata
Fields
Template:
Contracts
Company Name
VIDO SAMARZICH, INC.
Contract #
P20-6965, 20-6962
Agency
Public Works
Council Approval Date
9/17/2024
Insurance Exp Date
12/23/2024
Notes
P23-6707, 23-6705, 19-6923
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> PROPOSAL <br /> PROJECT NO.20.6965,ATI)5063(196)-STANDARD AVE BIKEWAY FROM WARNER AVE TO 2ND ST <br /> PROJECT Na 20.6962.ATP 5063(198) MCFADDEN AVE BIKEWAY FROM IIARBOI2 EI,VDTO GRAND AVE <br /> PROJECT NO.23-6707 STANDARD AVE PAVEMENT REHABILITATION FROM WARNER AVE TO 2ND ST <br /> PRO.I1'Al'NCL 23.6705-MCFADDEN N AVE.PAVEMENT III h ABILCI'ATION FROM HART3OR BLVD TO FAIRVIEW ST <br /> PROJECT T NO. 19-692.3-MCFADDEN AVE PAVEMENT REHABILICATION FROM FAIRVIEW ST TO RAI I I ST <br /> PROJECT NO.23-6706-MCFADDEN AVE PAVEMENT RBI IABILUTACION FROM MITT S'T To GRAND AVE <br /> Item Description Qty Unit Unit Price Anmunt <br /> 54 ADJUST WATER VALVE 138 EA $ $ <br /> FRAME AND COVER TO FINISH 1,500.00 <br /> GRADE PER C.S.A.STD PLAN 207,000.00 <br /> 1410 <br /> 55 ADJUST GROUNDWATER 6 EA $ $ <br /> MONITORING WELL COVER 1,500.00 9,000.00 <br /> TO FINISH GRADE <br /> 56 ADJUST SEWER CLEANOUT I EA $ $ <br /> FRAME AND COVER TO <br /> FINISHED GRADE PER C.S.A. 1,500.00 1,500.00 <br /> STD PLAN 1204 <br /> 57 ADJUST SEWER MANHOLE 66 EA $ $ <br /> FRAME AND GRATE TO FINISH <br /> GRADE PER C.S.A.STD PLAN 1,500.00 99,000.00 <br /> 1201 <br /> 58 ADJUST STORM DRAIN 13 EA $ $ <br /> MANHOLE FRAME AND 1,500,00 19,500.00 <br /> GRATE TO FINISH GRADE PER <br /> C.S.A.STD PLAN 1201 <br /> 59 RELOCATE FIRE HYDRANT 3 EA $ $ <br /> AND ASSEMBLY 18,000.00 54,000.00 <br /> 60 REMOVE FIRE HYDRANT AND 2 EA $ $ <br /> ASSEMBLY TO 3-FT BELOW 4,000.00 8,000.00 <br /> GRADE <br /> 61 ADJUST WATER METER TO 3 EA $ $ <br /> FINISHED GRADE PER C.S.A. 700.00 2,100.00 <br /> STD PLAN 1401 <br /> 62 ADJUST TRAFFIC PULLBOX TO 8 EA $ $ <br /> FINISHED GRADE 750.00 6,000.00 <br /> 63 FURNISH AND INSTALL NEW 16 EA $ $ <br /> WATER VALVE FRAME AND 1,700.00 27,200.00 <br /> COVER'TO FINISHED GRADE <br /> 64 REMOVE EXISTING CHAIN 140 LF $ $ <br /> LINK FENCE 40.00 5,600.00 <br /> 65 INSTALL 6'CHAIN LINK 140 LF $ $ <br /> FENCE PER SPPWC STD,PLAN 95.00 <br /> 600-4 13,300,00 <br /> 66 REMOVE AND INSTALL I EA $ $ <br /> STREET LIGHT WITH CONDUIT <br /> AND PULLBOX PER C.S.A. STD 12,000.00 12,000.00 <br /> PLAN 112611 <br /> 67 REMOVE CONFLICT UTILITY 11 EA $ $ <br /> SERVICE LINE 2,000.00 22,000.00 <br /> 68 INSTALL- I"COPPER WATER 4 EA $ $ <br /> SERVICE WITH I"METER PER <br /> C.S.A.STD. PLAN 1401, 10,000.00 40,000.00 <br /> LOCATION PER LANDSCAPE <br /> PLAN <br /> P-S of P-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.