Laserfiche WebLink
USASHADE <br /> a Fabrics Structures, <br /> SOURCFWEII PRICING <br /> CITY PART NUMBER DESCRIPTION LNn PRICE UNIT TOTAL <br /> 1 FULL CANTI HIP SINGLE 202.5 FULL CANTI HIP SINGLE(Joined)• $17,195.00 EACH $17,195.00 <br /> 1 Add Colourshade Fabric $164.00 EACH $164.00 <br /> 1 Add Coastal Primer $1,128.00 EACH $1,128,00 <br /> — <br /> 1 _ ^— Anchor Bolts $677.00 EACH $677.00 <br /> 1 Shipping and Handling $8,500.00 LTG $8,500.00 <br /> Taxable Subtotal $27,664,00 <br /> Sales Tax 7.75% $2,143.96 <br /> I Equipment Installation $16,289.40 EACH $16,289.40 <br /> 2 Site Preparation $2,500.00 PER DAY $5,000,00 <br /> 2 Planning&Design $1,750.00 PER DAY $3,500.00 <br /> 5ervices <br /> 1 Stamped Engineering Drawings $7,500.00 EACH $7,500.00 <br /> 1 Bonding $1,750.00 EACH $1,750.00 <br /> SUBTOTAL $63,847.36 <br /> List Loss 10%Discount -$1,719.30 <br /> TURNKEY INSTALLED <br /> TOTAL $62,127.86 <br /> USA SHADE reserves the right to Implement a surcharge for significant Increases In raw materials,Including the following,but not limited to:fuel,steel,fabric,and <br /> concrete,Proposal pricing Is only valid for 30 days due to the fluctuation In pricing.Due to recent significant increases experienced In raw steel and fabric materials,It <br /> maybe necessary to order,invoice,and receive payments for steel and fabric as soon as final sizing can be determined, <br /> ENGINEERING REQUIREMENTS NOTES <br /> Building Code CSC2022 <br /> Wind toad 11S mph <br /> Snow toad 5psf All Pricing, Terms and Conditions per USA SHADE-PlayPower, Inc. <br /> Drawlns 5+=e Electronic So UYCewelV Contract 010521-LTS-6 <br /> No.of Sealed Drawings 1 <br /> - Calculations Recured On File <br /> INCLUSIONS/EXCLUSIONS • <br /> INCLUDED EXCIUUED ENGINEERING. REQUIREMENTS INCLUDED EXCLUDED INSTALLATION -.MISCELLANEOUS <br /> pi r1 Sealed Drawings&Calculations n El Prevailing Wage/Certified Payroll <br /> ❑l n Permit Submittal(dimensioned site plan,Copy of master permit/plans O n "'"'�' <br /> with reference title page for plan submittal and all site specific Union Wages <br /> reference code annalysls provided by utllars) ��--55 <br /> [_� 0Permit fee LA Temporary Fenrng <br /> n n OSA Submittal&Fees n n Water and Electrical �"- <br /> n 0 Design and Engineering of Structure n i] landscape Repair <br /> n ❑ Design and Engineering of Foundation n [] Demolition(Existing Structurest <br /> 0 n NeactIons and loads for attachment to Walls,Rooftops,or Other ❑ Q Payment and Performance Bonds <br /> — <br /> 0 Ll Foundation Location and Elevation Survey 0 [) Special Inspection Fees <br /> C r;1,1g:should a crane be required and direct access not available,additional costs will incur by way of a Change Order <br /> Revised Foundations:pricing based on standard drilled pier foundations;If existing site conditions and(or constraints require revised foundations(i.e.spread footing), <br /> additional costs will Incur by way of a Change Order <br /> Undergrounds:existing underground utilities,irrigation,etc.to be relocated/capped by others—USA Shade will provide Dig Alert only <br /> eww.usa•shade.cem 800.666-5005 <br /> AZ:289388 CA 989456 LA:61716 NV:78724 NV 76724 NM-.383826 TN:68712 OR 1090003533 <br />