My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TARGET CORPORATION
Clerk
>
Contracts / Agreements
>
T
>
TARGET CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 3:42:24 PM
Creation date
10/24/2024 3:42:23 PM
Metadata
Fields
Template:
Contracts
Company Name
TARGET CORPORATION
Contract #
N-2024-348
Agency
Planning & Building
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
grant or deny any written request for additional time as determined by the Code Enforcement <br /> Manager, The City shall be under no obligation to consider untimely submitted time extension <br /> requests or requests which fail to provide any of the information required above. <br /> F. Removal of Graffiti. Owner,on behalf of itself,its successor and assigns hereby further <br /> covenants and agrees in favor of the City to keep the exterior surfaces of all structures, fixtures or <br /> other improvements located on the Property free and clear of graffiti. Graffiti shall be removed <br /> within twenty-four(24)hours following the time of its application. A failure by Owner to remove <br /> graffiti within twenty-four (24) hours following its application on any structure, fixture or other <br /> improvement located on the Property shall be deemed to be a Maintenance Deficiency for which <br /> no further notice under Section 3(D) needs to be given by the City. <br /> G. City May Cure Maintenance Deficiency. <br /> 1. In the event Owner fails to cure a Maintenance Deficiency within the time allowed, <br /> the City may initiate a public hearing pursuant to Section 41-651 of the Santa Ana <br /> Municipal Code. At such a public hearing the City shall consider such evidence and <br /> testimony of interested persons as may be relevant to the matter. If upon the <br /> conclusion of a public hearing, the City makes a written finding that a Maintenance <br /> Deficiency exists and that there appears to be non-compliance with the maintenance <br /> and repair obligations referenced in Section 3(A) of this Agreement, the City shall <br /> have the right to record the notice described in Section 30) of this Agreement and <br /> thereafter the City may enter upon or otherwise access the Property for the purpose <br /> of curing the Maintenance Deficiency without further notice to Owner. <br /> 2. The foregoing notwithstanding, the City, without notice to Owner, shall have the <br /> right to enter the Property and remove graffiti, solid waste, trash, or other debris <br /> under the following two circumstances: (i) a failure by Owner to remove graffiti <br /> within twenty-four(24) hours following its application on any structure, fixture or <br /> other improvement located on the Property that is visible from an adjacent or <br /> contiguous public right-of-way; or (ii) a failure by Owner to remove the <br /> accumulation of solid waste, trash, or other debris that is visible for a duration of <br /> twenty-four(24) hours from an adjacent or contiguous public right-of-way or from <br /> a designated fire lane on the Property. Any sum expended by the City for the <br /> removal of graffiti, solid waste, trash, or other debris pursuant to this Section <br /> 3(G)(2) of the Agreement shall become a lien on the Property in accordance with <br /> Section 3(H) and the City shall have the right to enforce such lien in the manner <br /> provided in Section 3(1). <br /> H. City's Lien Authority. Any sums expended by the City in enforcing, maintaining, <br /> repairing or replacing, curing any element of the Property of the Project as authorized in Section <br /> 3 for which a Maintenance Deficiency has been declared by the City to exist under Section 3(G), <br /> shall become a lien on the Property. The powers conferred upon City pursuant to this Section 3(H) <br /> are in addition to all other remedies which the City may have to enforce this Agreement, or any <br /> building or development project permit under other law including public nuisance abatement <br /> proceedings or any other action at law or equity. <br /> I. Enforcement of Liens by the City. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.