Laserfiche WebLink
VIFr <br /> blueviDlet <br /> NETWORKS <br /> A DIVISION OF THE COOK •BOARDMAN GROUP. LLC <br /> Proposal# P-9585 <br /> PROJECT MANAGEMENT <br /> Upon being awarded this project,Lanmor will immediately assign a project manager to oversee this project from <br /> beginning to end.It will be requested by Lanmor to have a"project kick-off"meeting in which all Contractor/Owner and <br /> Lanmor staff involved will meet to introduce each other and to go over scheduling,requirements,and other details of this <br /> project(can be completed via phone conference).The Lanmor project manager will supply the Contractor/Owner <br /> representative all the necessary documentation as described in the deliverables and will be the first point of contact for <br /> anything concerning this project. <br /> EXCLUSIONS(unless specifically included above) <br /> • Cutting,patching,and painting of existing walls. <br /> • Grouting,caulking, Glazing or provisioning of any glass for Storefront entrances. <br /> • Disconnect,reconnect,or relocation of plumbing,electrical,HVAC or other services. <br /> • Painting and finishing of unfinished doors and frames. <br /> • Framing, rough carpentry,and drywall required. <br /> • Master keying of cylinders to existing key systems. <br /> • Installation of customer furnished materials. <br /> • Required building permits and authority having jurisdiction approval. <br /> • Work scheduled after hours or weekends. <br /> • Expedited shipping charges/Acceleration of installation schedule. <br /> • Delay not directly caused by Blueviolet/Lanmor Services. <br /> • Changes in scope,terms and conditions or schedule not covered in pricing. <br /> • No back charges against Blueviolet/Lanmor Services without providing 72 hour written notice and an <br /> opportunity to cure. <br /> • Work area containment. <br /> • 110v electrical. <br /> • Extra costs of return trips are required due to inadequate preparation of the opening(s)prior to <br /> installation.All openings must be ready for install. <br /> • Permits of any kind. <br /> • Any Lifts needed due to ceiling heights. <br /> • Conduit and Raceways for necessary for connectivity. <br /> REFERENCES <br /> 1. APS—Robert Griffith,Manager of Security Infrastructure,(602)809-2306 <br /> 2. Maricopa Integrated Health System—Michael Gallante, Chief of Security,(602)509-5014 <br /> 3. Transperfect—Wallace Michaelson, Director Infrastructure&Technology,(602)281-0742 <br /> 4. Sandia National Laboratories—Melanie Florez, Project Manager,(505)845-0011 <br /> The human connection between you and your technology. <br /> 1781.5 Newhope Street, Suite M Fountain Valley, CA 92708 www.bluevioletnetworks.com <br />