My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BLUEVIOLET NETWORKS
Clerk
>
Contracts / Agreements
>
B
>
BLUEVIOLET NETWORKS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 2:39:06 PM
Creation date
11/4/2024 2:38:56 PM
Metadata
Fields
Template:
Contracts
Company Name
BLUEVIOLET NETWORKS
Contract #
A-2024-160
Agency
Public Works
Council Approval Date
10/1/2024
Expiration Date
9/30/2027
Insurance Exp Date
6/15/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bliJeviDlet <br /> NETWORKS <br /> A DIVISION OF THE COOK&BOARDMAN GROUP, LLC <br /> Proposal#P-9586 <br /> Project Commissioning <br /> New Door Operation Commissioning process: <br /> • Confirm new reader is programmed in access control system <br /> • Confirm new Status contact functionality <br /> o Closed Status <br /> o Open Status <br /> o Forced Open Status <br /> • Request for Exit <br /> o Confirm Request for exit functionality <br /> ■ Exit door and check AMAG log for valid functionality <br /> • Card Reader <br /> o Confirm card read of a valid credential <br /> o Confirm negative card read of invalid credentials <br /> • Locking Hardware <br /> o Confirm mechanical operation of new locks <br /> o Confirm electrical operation of lock with valid card read <br /> o Confirm manual override with key operation <br /> • Power Connection <br /> o Confirm hinge or armored cable is properly installed and functioning <br /> • Customers sign off <br /> New Duress Button Commissioning process: <br /> • Confirm new duress button is programmed in access control system <br /> • Confirm duress buttons signals AMAG system <br /> • Confirm Duress buttons signal local authorities <br /> • Confirm Key reset works <br /> New Door Controller Commissioning process: <br /> • Confirm new controller is programmed in access control system <br /> • Label all wires and Card reader ports <br /> • Label New Controller with proper AMAG Chain naming scheme <br /> • Document with pictures of Controller Installation location <br /> • Batteries <br /> o Label Batteries with installation date <br /> o Load test batteries and label with install date <br /> • Label Enclosure with proper naming scheme and enclosure contents <br /> • Document with pictures of Controller Installation location <br /> • Customers sign off <br /> The human connection between you and your technology. <br /> 17815 Newhope Street, Suite M Fountain Valley, CA g27o8 www.bluevioletnetworks.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.