Laserfiche WebLink
blueviolet <br /> NETWORKS <br /> A DIVISION OF THE COOK&BOARDMAN GROUP, LLC <br /> Proposal# P-9586 <br /> PRO EMENT <br /> Upon be arded this project, Lanmor will immediately assign a project manager to oversee this project from <br /> beginning to end.It will be requested by Lanmor to have a"project kick-off'meeting in which all Contractor/Owner and <br /> Lanmor staff involved will meet to introduce each other and to go over scheduling, requirements,and other details of this <br /> project(can be completed via phone conference).The Lanmor project manager will supply the Contractor/Owner <br /> representative all the necessary documentation as described in the deliverables and will be the first point of contact for <br /> anything concerning this project. <br /> EXCLUSIONS(unless specifically included above) <br /> • Cutting,patching,and painting of existing walls. <br /> • Grouting,caulking,Glazing or provisioning of any glass for Storefront entrances. <br /> • Disconnect,reconnect,or relocation of plumbing,electrical,HVAC or other services. <br /> • Painting and finishing of unfinished doors and frames. <br /> • Framing,rough carpentry,and drywall required. <br /> • Master keying of cylinders to existing key systems. <br /> • Installation of customer furnished materials. <br /> • Required building permits and authority having jurisdiction approval. <br /> • Work scheduled after hours or weekends. <br /> • Expedited shipping charges/Acceleration of installation schedule. <br /> • Delay not directly caused by Blueviolet/Blueviolet/Lanmor Services. <br /> • Changes in scope,terms and conditions or schedule not covered in pricing. <br /> • No back charges against Blueviolet/Blueviolet/Lanmor Services without providing 72 hour written notice <br /> and an opportunity to cure. <br /> • Work area containment. <br /> • 110v electrical. <br /> • Extra costs of return trips are required due to inadequate preparation of the opening(s)prior to <br /> installation.All openings must be ready for install. <br /> • Permits of any kind. <br /> • Any Lifts needed due to ceiling heights. <br /> • Conduit and Raceways for necessary for connectivity. <br /> REFERENCES <br /> 1. APS—Robert Griffith,Manager of Security Infrastructure, (602) 809-2306 <br /> 2. Maricopa Integrated Health System—Michael Gallante,Chief of Security,(602)509-5014 <br /> 3. Transperfect—Wallace Michaelson, Director Infrastructure&Technology, (602)281-0742 <br /> 4. Sandia National Laboratories—Melanie Florez, Project Manager, (505)845-0011 <br /> WARRANTY <br /> Blueviolet/Blueviolet/Lanmor Services warranties all product and software for a period of one year from partial and or <br /> complete system activation.Labor for a period of 90 days from partial and or complete system activation.Notice of a <br /> warranty claim must be received by Blueviolet/Blueviolet/Lanmor Services within the warranty period.The exclusive <br /> remedy under the warranty is Blueviolet/Blueviolet/Lanmor Services' obligation to repair or replace any defective work, <br /> The human connection between you and your technology. <br /> 17815 Newhope Street, Suite M Fountain Valley, CA 92708 www.bruevioletnetworks.com <br />