Laserfiche WebLink
Exhibit D: Proposed Structure Improvements ("Work Plan") <br />825 North Lacy Street <br />Item <br />Year <br />Improvement <br />1 <br />2024 <br />Reroof main house and garage and repair eaves as needed, like -for -like <br />2 <br />2024 <br />Remove internal masonry fireplace and chimney due to structural safety concerns, <br />and repair external wood chimney like -for -like <br />3 <br />2024 <br />Repair windows and exterior window framing on main house and garage, like -for - <br />like <br />4 <br />2024 <br />Repair window screens throughout <br />5 <br />2024 <br />Repair termite damage as needed <br />6 <br />2026 <br />Repaintexterior <br />7 <br />2027 <br />Replace north side door with period -appropriate door and hardware <br />8 <br />2028 <br />Replace exterior lighting with period -appropriate lighting on main house and <br />garage <br />9 <br />2029 <br />Replace plastic door screens with period -appropriate wood screens <br />10 <br />2030 <br />Replace gutters with compatible gutters (choosing appropriate color and material) <br />11 <br />2031 <br />Repair siding on main house and garage as needed, like -far -like <br />12 <br />2032 <br />Replace garage door with period -appropriate garage door <br />