My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Appropriation Adjustments to Recognize Special Gas Tax and Transportation System Improvement Funds
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
11/19/2024
>
Item 19 - Appropriation Adjustments to Recognize Special Gas Tax and Transportation System Improvement Funds
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2024 11:06:38 AM
Creation date
11/13/2024 10:30:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19
Date
11/19/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT 1 <br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED: <br />Warner Ave Impr: Ph 1- Main - Oak This project will widen Warner Avenue between Main Street and <br />Oak Street from 2 to 3 lanes in each direction. The project also <br />includes additional left turn lanes at Main Street, bus turn outs, <br />raised medians, and bike lanes along Warner Avenue between Main <br />Street and Oak Street. <br />The MPAH (Master Plan of Arterial Highways) Strategic Plan Technical <br />Report identified the need for Warner Avenue to be widened to a six- <br />lane major arterial to meet MPAH requirements. The existing Average <br />Daily Traffic (ADT) is in excess of 29,600 vehicles per day. The <br />proposed improvements will allow the segment to accommodate future <br />traffic volumes at a Level of Service A and increase operational <br />efficiency. <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widening <br />LOCATION MAP <br />PROJECT COSTS <br />Construction <br />FY 24/25 <br />993,000 <br />434,400 <br />- <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Engineering <br />Right-Of-Way <br />TOTAL 1,427,400 <br />SOURCE OF FUNDS <br />DAF: DA-IV <br />FY 24/25 <br />- <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />M2 LOCAL FAIRSHARE <br />MEASURE M2 COMPETITIVE <br />TSIA AREA E <br />993,000 <br />- <br />434,400 <br />1,427,400TOTAL <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineering Alex Bangean, Senior Civil Engineer 01-Nov-2024
The URL can be used to link to this page
Your browser does not support the video tag.