Laserfiche WebLink
provided in the California Stormwater Quality Association (CASQA) Stormwater <br /> BMP Handbook for Construction. <br /> (b) Install tracking control BMPs at the vehicle access point to the License Area.Licensee <br /> shall install tracking control BMPs per the TC-1 detail provided in the California <br /> Stormwater Quality Association (CASQA) Stormwater BMP Handbook for <br /> Construction. <br /> (c) Install a fence, if required,and Green Screen. <br /> (d) Post and install appropriate signage in strict accordance with Santa Ana Municipal <br /> Code Section 10-96 and CA Penal Code Section 602,to the satisfaction of the Santa <br /> Ana Police Department. <br /> Throughout the duration of the License Agreement,the Licensee shall: <br /> a) Cover all stockpiles that are not actively being used or scheduled to be used within a <br /> seven(7)day period.Additionally, all stockpiles shall be covered prior to the onset of <br /> precipitation. Licensee shall ensure that stockpile coverings are installed securely to <br /> protect from wind and rain. Stockpiles shall not be taller than the property's fence <br /> height. <br /> b) Maintain effective Tracking control BMPs to prevent sediment tracking off-site from <br /> the License Area. <br /> c) Maintain effective Sediment control BMPs along the entire perimeter of the License <br /> Area, at all adjacent storm drain inlets, and on all non-active slopes,as appropriate. <br /> d) Sweep the street, sidewalk,and parkway adjacent to the License Area as-needed so <br /> the public right-of-way remains clean and free of dirt. <br /> e) Use a dumpster or appropriate waste receptacle to discard of all trash and debris. <br /> Dumpsters and waste receptacles shall be covered prior to the onset of precipitation. <br /> f) Implement Wind Erosion Control BMPs (dust control), as appropriate, per the WE-1 <br /> detail provided in the California Stormwater Quality Association (CASQA) <br /> Stormwater BMP Handbook for Construction. <br /> g) Remove graffiti on the fence or green screen within one(1) day of notification by the <br /> City. <br /> h) Repair vandalism to fence or green screen within one (1) day of notification by the <br /> City. <br /> The Licensee shall maintain the licensed area and its perimeter free of weeds <br /> and/or vegetation. Should the City provide notice to remove any weeds and/ <br /> or vegetation, the Licensee shall complete this work to the City's <br /> satisfaction within 72 hours of notification. <br /> Within fourteen(14)days of vacating the License Area,the Licensee shall clean up the License <br /> Area as outlined below: <br /> a) Remove all trash, debris, sediment, stockpiles,and construction materials from the <br /> License Area. <br /> b) Remove old and/or damaged sediment control BMPs from the License Area and <br /> install new sediment control BMPs along the entire perimeter of the License Area. <br /> Appropriate sediment control BMPs include straw wattle, gravel bag berm, or silt <br /> fence. Licensee shall install sediment control BMPs per the SE-5, SE-6, or SE-1 <br /> details provided in the California Stormwater Quality Association(CASQA) <br /> Stormwater BMP Handbook for Construction. <br /> c) Remove Tracking Control BMPs from the License Area. <br /> d) Cover the surface of the entire License Area with two(2) inches of three-quarter <br /> (3/4) inch diameter gravel. <br /> Page 2 of 6 <br />