Laserfiche WebLink
ELEC <br />LVUPUPUPUPRWUP 5%UP 5%VANUP 5%UP 2%GPARCELñ <br />ññ <br />ññññ <br />ñññññFEC <br />FECFECUSPSUP 3% <br />3.5%4.0%STAIR B1STAIR B2UPDN 6.5%DN 4.67%DN 4.67%6.70'126.34'126.34'126.00'184'-4"122'-8" <br />122'-8" <br />NO OPENINGS <br />184'-4"NO OPENINGS50'-9"84'-6"78'-2"16'-4"1614'-0"246'-2"40.1%3'-4"13'-1"WALL LENGTHOPENING LENGTHWALL LENGTHOPENING LENGTH26'-0"32'-10"44'-2"62'-3"45'-0"75'-9"18'-4" <br />ELEC <br />LVRW G UP 5%RAMP UP93' (RUN) (5% SLOPE) = 4.65' (RISE)UP 3.5%DN 5%OPEN TO BELOWVANUP 5%UPDNUPEVEVEVEVEV <br />EV EVEVñ <br />ññ <br />ññññ <br />ññññ <br />ñFEC <br />FECFECFECEVEVEVEV EV <br />EVEVEVEVEVEVEVEVSTAIR B1STAIR B2DNUP149'-0"84'-0"2614'-0"252'-8"41.1%3'-4" <br />16'-4"184'-4"122'-8" <br />122'-8" <br />NO OPENINGS <br />184'-4"NO OPENINGSWALL LENGTHOPENING LENGTHWALL LENGTHOPENING LENGTH26'-0"32'-10"44'-2"62'-3"45'-0"75'-9"18'-4"INT. WALL & OPENINGSELEC <br />LV############################################RW G <br />#####UP 5%UP 5%UP 3.5%DN 5%######UPDNUP#EVEVñ <br />ññ <br />ññññ <br />ññññ <br />ñFEC <br />FECFECFECEVEVEVEVEV <br />EV <br />EVEV EV <br />EVEVEVEVEVEVEVEVEVSTAIR B1STAIR B2DNUP84'-6"64'-6"103'-0"3614'-0"255'-4"41.6%3'-4"184'-4"122'-8" <br />122'-8" <br />NO OPENINGS <br />184'-4"NO OPENINGSWALL LENGTHOPENING LENGTHWALL LENGTHOPENING LENGTH44'-5"32'-10"44'-2"62'-3"45'-0"75'-9"ELEC LVSTAIR B1STAIR B2DNUPDNUPRW G RAMP UP93' (RUN) (5% SLOPE) = 4.65' (RISE)UP 3.5%DN 5%ññññ ññññññFEC <br />FEC4N/AN/AN/ACCOPYRIGHTIt is the clients responsibility prior to or during construction to notify the architect in writingof any perceived errors or omissions in the plans and specifications of which a contractorthoroughly knowledgeable with the building codes and methods of construction shouldreasonably be aware. Written instructions addressing such perceived errors or omissionsshall be received from the architect prior to the client or clients subcontractors proceedingwith the work. The client will be responsible for any defects in construction if theseprocedures are not followed.Architecture + Planning17911 Von Karman Ave.Suite 200Irvine, CA 92614ktgy.com949.851.2133License StampProject Contact:Email:Principal: Project Designer:Project Director:KTGY Project No:2017-0934Debbie Hollanddholland@ktgy.comWil WongD. SchoolmeesterDebbie HollandDeveloperPHONE NO.4199 CAMPUS DRIVEIRVINE, CA 92612(714) 342-2502415 & 515 E. 4TH STREET, SANTA ANA, CA 92701 <br />4TH AND MORTIMERNo.Date Description06-21-2023 FIFTH BUILDING DEPARTMENT SUBMITTALA03-21-23ADDENDUM AEXTERIOR OPENINGANALYSIS BUILDING BGARAGEA1-56SCALE:11"=20'BUILDING B LEVEL 1SCALE:21"=20'BUILDING B LEVEL 2SCALE:31"=20'BUILDING B LEVEL 3SCALE:41"=20'BUILDING B LEVEL 4SCALE:51"=20'NOT USEDSCALE:61"=20'NOT USED06-21-23