A0-01CCOPYRIGHTIt is the clients responsibility prior to or during construction to notify the architect in writingof any perceived errors or omissions in the plans and specifications of which a contractorthoroughly knowledgeable with the building codes and methods of construction shouldreasonably be aware. Written instructions addressing such perceived errors or omissionsshall be received from the architect prior to the client or clients subcontractors proceedingwith the work. The client will be responsible for any defects in construction if theseprocedures are not followed.Architecture + Planning17911 Von Karman Ave.Suite 200Irvine, CA 92614ktgy.com949.851.2133License StampProject Contact:Email:Principal: Project Designer:Project Director:KTGY Project No:2017-0934Debbie Hollanddholland@ktgy.comWil WongD. SchoolmeesterDebbie HollandDeveloperPHONE NO.4199 CAMPUS DRIVEIRVINE, CA 92612(714) 342-2502415 & 515 E. 4TH STREET, SANTA ANA, CA 92701
<br />4TH AND MORTIMERNo.Date Description06-21-2023 FIFTH BUILDING DEPARTMENT SUBMITTALA06-21-23ADDENDUM A4TH AND MORTIMER415 & 515 E. 4TH STREET, SANTA ANA, CA 92701DP NO. 2018-28ABBREVIATIONSPROJECT TEAM DIRECTORYVICINITY MAPLEGAL DESCRIPTIONDEFERRED SUBMITTALSFIRE SPRINKLER SYSTEMTHE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING THE FOLLOWING DEFERRED SUBMITTALS TOTHE CITY OFFICIALS FOR REVIEW AND APPROVAL.FIRE ALARM SYSTEMSIGNAGE PROGRAM INCLUDING ALL SITE & BUILDING ACCESSIBILITY SIGNAGEROOF / FLOOR TRUSS SYSTEM5.3.1.4.2.6.SWIMMING POOL & SPASECURITY SYSTEMSHEET INDEXTEL.CIVIL ENGINEERFuscoe Engineering, Inc.16795 Von Karman, Suite #100Irvine, CA 92606(949) 474-1960Josh RuizTEL.LANDSCAPE ARCHITECTLandStudio 360333 El Camino Real, Studio #200T ustin, CA 92780(949) 382-5811Alex PolenDavid LingTEL.DEVELOPERRed Oak Investments4199 Campus DriveIrvine, CA 92612(714) 342-2502Andrew NelsonAlex WongTEL.ARCHITECTKTGY ARCHITECTURE + PLANNING17911 Von Karman Ave., Ste. 200Irvine, CA 92614(949) 851-2133Debbie HollandTEL.STRUCTURAL ENGINEERDCI Engineers2600 Michelson Dr #930Irvine, CA 92612(949) 892-4956Maggie ClavijoTEL.DRY UTILITYDRI Utility Consulting25060 Hancock Ave, Ste 103 #464Murrieta, CA 92562951-757-9096Dave RamirezTEL.MECHANICAL ENGINEERMulti Mechancial, Inc469 E. Blaine StreetCorona, CA 92879951-736-6040Brandon AbblittTEL.GREEN BUILDINGVCA Green1845 W. Orangewood Ave, Ste 220Orange, CA 92868714-363-4700Roshni LadTEL.PLUMBING ENGINEERAMPAM17036 Avakon Blvd.Carson, CA 90746310-835-1532Daniel LucasTEL.ELECTRICAL ENGINEERSBE Electrical Contracting2817 McGaw AveIrvine, CA 92614714-544-5065Eric GrossmanTEL.FIRE PROTECTIONAutomatic Fire Protection714-841-2066Craig SpicerTEL.INTERIOR DESIGNERAriel Fox Design16 N Marengo Suite 415Pasadena, CA 91101(818) 465-3366Ariel JohnsonHannah AskeyTEL.LOW VOLTAGE SYSTEMSHCI Systems, Inc.1731 Reynolds AveIrvine, CA 92614949-724-5000Mike PetersTEL.GEOTECHNICAL Geocon West, Inc.2807 McGaw AveIrvine, CA 92614949-346-1109Jelisa Thomas AdamsTEL.SIGNAGE TEL.ACOUSTICALEilar Associates, Inc.210 South Juniper St, Ste 100Escondido, CA 92025760-738-5570Mo OuwengaGENERAL NOTESSHEET INDEX7.METAL STAIRS8.ELEVATORS9.METAL AND GLASS GUARDRAILS10.STOREFRONT SYSTEM11.AWNINGS AND CANOPIESSHEET INDEXLOG OF ISSUED DOCUMENTSCCOPYRIGHTA.B.ANCHOR BOLTABV.ABOVEA/CCONDENSING UNITACOUST.ACOUSTICALA.D.AREA DRAINADJ.ADJUSTABLEA.F.F.ABOVE FINISH FLOORALT.ALTERNATEALUM.ALUMINUMAPPROX.APPROXIMATEARCH.ARCHITECTASPH.ASPHALTBA.BATHROMBD.BOARDBITUM.BITUMINOUSBLDG.BUILDINGBLK.BLOCKBLKG.BLOCKINGBM.BEAMBR.BEDROOMB.U.R.BUILT-UP-ROOFINGCAB.CABINETC.B.CATCH BASINCEM.CEMENTCER.CERAMICC.I.CAST IRONC.G.CORNER GUARDCJCEILING JOISTCLG.CEILING JOISTCLKG.CAULKINGCLO.CLOSETCLR.CLEAR / CLEARANCECMUCONCRETE MASONRY UNITCOL.COLUMNCONC.CONCRETECONSTR.CONSTRUCTIONCONT.CONTINUOUSCORR.CORRIDORCPTCARPETCSMTCASEMENTCNTR.COUNTERCTR.CENTERDBL.DOUBLEDEPT.DEPARTMENTD.F.DRINKING FOUNTAINDET.DETAILDHDOUBLE HUNGDIA.DIAMETERDIM.DIMENSIONDISP.DISPENSERDN.DOWNDR.DOOR OPENINGDSDOWNSPOUTDWDISHWASHERDWG'SDRAWINGSDWR.DRAWERE.J.EXPANSION JOINTEL.ELEVATIONELEC.ELECTRICALELEV.ELEVATOREMER.EMERGANCYENCL.ENCLOSEDE.P.ELECTRICAL PANELEQMT.EQUIPMENTEXH.EXHAUSTEXT.EXTERIOREXT'GEXISTINGF.A.FIRE ALARMF.A.U.FORCED AIT UNITF.D.FLOOR DRAINFDN.FOUNDATIONF.E.FIRE EXTINGUISHERF.E.C.FIRE EXTINGUISHER CABINETF.F.FINISH FLOORF.G.FINISH GRADEFGL.FIBERGLASSFIN.FINISHF.J.FLOOR JOISTFLR.FLOORF.O.C.FACE OF CONCRETEF.O.F.FACE OF FINISHF.O.S.FACE OF STUD/SHEATHINGFRFRENCHFRM'GFRAMINGFURR.FURRINGGA.GUAGEGALV.GALVANIZEDGAR.GARAGEG.B.GRAB BARGFCIGROUND FAULT CIRCUITINTERUPTERG.I.GALVANIZED IRONGLGLASS / GLAZINGGLBGLUE LAMINATED BEAMGSMGALVANIZED SHEET METALGYP.GYPSUMGYP.BD.GYPSUM BOARDH.B.HOSE BIBBHCHOLLOW COREHDR.HEADERHDWD.HARDWOODHMHOLLOW METALHORIZ.HORIZONTALHVACHEATING VENTILATING AIRCONDITIONINGINSUL.INSULATIONINT.INTERIORLAM.LAMINATELAV.LAVATORYLT.LIGHTMBRMASTER BEDROOMMCMEDICINE CABINETMECH.MECHANICALMEMB.MEMBRANEMET.METALMFGMANUFATURINGMFR.MANUFACTURERMIR.MIRRORMISC.MISCELLANEOUSMLD'GMOULDINGMTD.MOUNTEDMUL.MULLIONNG.NATURAL GRADEN.I.C.NOT IN CONTRACTNO.NUMBERNOM.NOMINALN.T.S.NOT TO SCALEOBS.OBSCUREO.C.ON CENTEROPNG.OPENINGOPP.OPPOSITEOSA.OUTSIDE AIRPBPUSH BUTTONPDR.POWDER ROOMPL.PLATEPLYWD.PLYWOODPLUMB.PLUMBINGP.O.C.POINT OF CONNECTIONPR.PAIRPREFAB.PREFABRICATEDR.A.G.RETURN AIR GRILLER.C.RESILIENT CHANNELR.D.ROOF DRAINREF.REFERENCEREFR.REFRIGERATORREINFREINFORCEDRGTR.REGISTERREQ.REQUIREDRESIL.RESILIENTRJRAFTER JOISTSRM.ROOMR.O.ROUGH OPENINGSCSOLID CORESCHED.SCHEDULESERV.SERVICESS.FSQUARE FEETSGDSLIDING GLASS DOORSHSINGLE HUNGSHT.SHEETSHT'GSHEATHINGSIM.SIMILARSLSLIDINGSPEC.SPECIFICATIONSSQ.SQUARESSSPSINGLE SHELF SINGLE POLESSDPSINGLE SHELF DOUBLE POLESTD.STANDARDSTL.STEELSTOR.STORAGESTRUCT.STRUCTURALSYM.SYMMETRICALT.B.TOWEL BARTEL.TELEPHONETEMP.TEMPEREDTER.TERRAZZOT>ONGUE AND GROOVETRSM.TRANSOMT.V.TELEVISIONTYP.TYPICALT.O.SHTG.TOP OF SHEATHINGT.O.C.TOP OF CONCRETE OR CURBT.O.P.TOP OF PARAPETT.O.W.TOP OF WALLU.N.O.UNLESS NOTED OTHERWISEVCT.VINYL COMPOSITE TILEVEST.VESTIBULEW.C.WATER CLOSETWD.WOODWDW.WINDOWW.H.WATER HEATERW.I.WROUGHT IRONW.I.C.WALK-IN CLOSETWSCT.WAINSCOT1.THE CONTRACTOR SHALL REVIEW ALL CONSTRUCTION DOCUMENTS PRIOR TO BID AND START OFCONSTRUCTION. THE CONTRACTOR SHALL CONFIRM THAT WORK INDICATED IN THE CONSTRUCTIONDOCUMENTS IS BUILDABLE AS SHOWN. IN THE EVENT A DISCREPANCY IS FOUND IN THE CONTRACTDOCUMENTS, THE OWNER AND ARCHITECT SHALL BE NOTIFIED IN WRITING IMMEDIATELY.2.THE CONTRACTOR SHALL COMPARE ALL CONSTRUCTION DOCUMENTS WITH THE EXISTING SITE CONDITIONSPRIOR TO BID AND START OF CONSTRUCTION. IN THE EVENT A DISCREPANCY IS FOUND IN THE CONTRACTDOCUMENTS, THE OWNER AND ARCHITECT SHALL BE NOTIFIED IN WRITING IMMEDIATELY.3.DO NOT SCALE DRAWINGS. REVIEW ALL DIMENSIONS SHOWN ON CONSTRUCTION DOCUMENTS PRIOR TO BIDAND START OF CONSTRUCTION. IN THE EVENT A DISCREPANCY IS FOUND IN THE CONTRACT DOCUMENTS,THE OWNER AND ARCHITECT SHALL BE NOTIFIED IN WRITING IMMEDIATELY.4.FIRE RESISTANCE RATINGS, ASSEMBLIES, CLASSIFICATIONS, STANDARDS AND LISTINGS INDICATED ARETAKEN FROM VARIOUS REFERENCE STANDARDS. MAINTAIN, AT THE PROJECT SITE, A COPY OF ANAPPLICABLE EDITION OF EACH REFERENCE STANDARD.5.REVIEW PLAN LAYOUT, VERIFY AND COORDINATE INTERFACES OF ALL PORTIONS OF THE WORK PRIOR TOACTUAL EXECUTION.6.PROVIDE ALL WORK NECESSARY FOR A COMPLETE PROJECT, INCLUDING ANYTHING WITHIN THE LIMIT OFWORK, OUTSIDE PROPERTY LINE, ON ADJACENT PROPERTIES AND IN THE PUBLIC WAY.7.ALL CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES ANDAMENDMENTS.8.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS AND METHODS,TECHNIQUES, SEQUENCES AND PROCEDURES REQUIRED FOR SAFE EXECUTION OF THE WORK AND FORINITIATING, MAINTAINING AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMMING IN CONNECTIONWITH THE WORK, CONTRACTOR SHALL HIRE SUB-CONTRACTORS AND SUPPLIERS WITH PROVEN ABILITY TOPROVIDE AND PERFORM QUALITY WORKMANSHIP ON THIS TYPE OF PROJECT.TITLE SHEETPARCEL 1LOT 1 IN BLOCK 8 OF FRUIT'S ADDITION TO SANTA ANA, ASSHOWN ON A MAP RECORDED IN BOOK 9, PAGE 91 OFMISCELLANEOUS MAPS, RECORDS OF LOS ANGELES COUNTY,CALIFORNIA.PARCEL 2THE WEST HALF OF LOT 2 IN BLOCK 8 OF FRUIT'S ADDITION TOSANTA ANA, AS SHOWN ON A MAP RECORDED IN BOOK 9, PAGE91 OF MISCELLANEOUS MAPS, RECORDS OF LOS ANGELESCOUNTY, CALIFORNIA.APN: 398-338-0803-18-202250% DD PROGRESS SET05-20-2022100% DD PROGRESS SET08-01-2022FIRST BUILDING DEPARTMENT SUBMITTALSCOPE OF WORKSEPARATE PERMITS-LIGHT STANDARD(S)-PEDESTRIAN PROTECTION-BLOCK WALL(S)-FENCES-DEMOLITION-SITE IMPROVEMENTS-ELECTRIC VEHICLE CHARGING STATIONS-POOL AND DECK AT THE 3RD LEVEL OF THE BUILDING A-TENANT IMPROVEMENT FOR RETAIL AND RESTAURANT CORE AND SHELL SPACESPLAN CHECK #101111464:Building A: Residential- 99 dwelling units plus circulation areas in 7-story structure (first two floors under concretepodium lid, top five floors in wood construction) including (16) studios, (28) 1 bedrooms, (36) 2 bedrooms, (3) 3bedrooms, (16) 4 bedrooms units.PLAN CHECK #101111465:Building A: Common areas used by building residents and staff:1st floor-leasing office, mail room, fitness center,co-working area, 2nd floor-storage area, yoga studio, offices, 3rd-clubroom, and 7th floor-roof deckPLAN CHECK #101111466:Building A: Commercial-Ground floor commercial areas consisting of future restaurant space at the corner andin-line commercial suites along 4th street. This is core and shell permit only. Future tenant improvement will beunder separate permit.PLAN CHECK #101111467:Building A: Parking garage- A 5-story above ground parking structure with drive entry off of 5th Street thatprovides parking and direct walking access to the adjacent apartment building and commercial suites on theground floor.PLAN CHECK #101111472:Building B: Residential -70 dwelling units and interior circulation space in an above ground 5 story woodstructure including (5) studios, (12) 1 bedroom, (28) 2 bedrooms, (6) 3 bedrooms (19) 4 bedrooms units.PLAN CHECK #101111473:Building B: Parking garage- 5 tier above ground parking structure with drive entry access off of 5th Streetthat provides parking and direct walking access to the adjacent apartment building.PROJECT CONTACTTEL.ANDREW NELSONRed Oak Investments4199 Campus DriveIrvine, CA 92612(714) 342-2502Email: anelson@redoakinv.com09-16-2022SECOND BUILDING DEPARTMENT SUBMITTAL-LANDSCAPE STRUCTURES11-08-2022THIRD BUILDING DEPARTMENT SUBMITTALSheet List TableSheet NumberSheet TitleA0-01TITLE SHEETA0-01.1SHEET INDEXA0-02Code & Project SummariesA0-03ABuilding A Allowable Area CalculationsA0-03BBuilding B Allowable Area CalculationsA0-04Building and Unit SummaryA0-05Building A School Fees ExhibitA0-06Building B School Fees ExhibitA0-11Building A First Floor Fire Protection PlansA0-12Building A Second Floor Fire Protection PlansA0-13Building A Third Floor Fire Protection PlansA0-14Building A Fourth Floor Fire Protection PlansA0-15Building A Fifth Floor Fire Protection PlansA0-16Building A Sixth Floor Fire Protection PlansA0-17Building A Seventh Floor Fire Protection PlansA0-21Building B First Floor Fire Protection PlanA0-22Building B Second Floor Fire Protection PlanA0-23Building B Third Floor Fire Protection PlanA0-24Building B Fourth Floor Fire Protection PlanA0-25Building B Fifth Floor Fire Protection PlanA0-31Building A First Floor Exiting AnalysisA0-32Building A Second Floor Exiting AnalysisA0-33Building A Third Floor Exiting AnalysisA0-34Building A Fourth Floor Exiting AnalysisA0-35Building A Fifth Floor Exiting AnalysisA0-36Building A Sixth Floor Exiting AnalysisA0-37Building A Seventh Floor Exiting AnalysisA0-38Building A Roof Deck Area ExhibitA0-41Building B First Floor Exiting AnalysisA0-42Building B Second Floor Exiting AnalysisA0-43Building B Third Floor Exiting AnalysisA0-44Building B Fourth Floor Exiting AnalysisA0-45Building B Fifth Floor Exiting AnalysisGRN.1CALGREEN RESIDENTIAL MEASURESGRN.2CALGREEN NON-RESIDENTIAL MEASURESEN.1Title 24 Energy Compliance - Bldg AEN.1.1Title 24 Energy Compliance - Bldg AEN.2Title 24 Energy Compliance - Bldg BEN.2.1Title 24 Energy Compliance - Bldg BEN.3Title 24 Energy Compliance - Amenities - Bldg AEN.3.1Title 24 Energy Compliance - Amenities - Bldg AEN.3.2Title 24 Energy Compliance - Amenities - Bldg BA0-70Conditions of ApprovalA0-71Conditions of ApprovalA0-72Conditions of ApprovalA0-73Conditions of ApprovalA0-74Conditions of ApprovalA0-75Conditions of ApprovalA0-76Conditions of ApprovalA0-80Geotechnical ReportA0-81Geotechnical ReportA0-82Geotechnical ReportA0-83Geotechnical ReportA0-84Geotechnical ReportA0-85Geotechnical ReportA0-86Geotechnical ReportA0-87Geotechnical ReportA0-88Geotechnical reportA0-89Geotechnical ReportA0-90Geotechnical ReportA0-91Exterior Acoustical Analysis ReportA0-92Exterior Acoustical Analysis ReportA0-93Exterior Acoustical Analysis ReportA0-94Exterior Acoustical Analysis ReportA0-95Building A Addressing Plans & USPS ApprovalA0-96Building A Addressing Plans & USPS ApprovalA0-97Building A Addressing Plans & USPS ApprovalA0-98Building B Addressing Plans & USPS ApprovalA0-99Building B Addressing Plans & USPS ApprovalA1-20Architectural Site PlanA1-21Police Department Building Security RegulationsA1-22Police Department Building Security RegulationsA1-23Police Department Building Security RegulationsA1-24Building A Site Accessibility ExhibitA1-24.1Building A Site Accessibility ExhibitA1-25Building B Site Accessibility ExhibitA1-25.1Building B Site Accessibility ExhibitA1-26Building A Average Grade Plane ExhibitA1-27Building B Average Grade Plane ExhibitA1-30Fire Access PlanA1-30.1Fire Flow Test ReportA1-50Exterior Opening Analysis Building AA1-51Exterior Opening Analysis Building AA1-52Exterior Opening Analysis Building BA1-53Exterior Opening Analysis Building BA1-54Exterior Opening Analysis Building A GarageA1-55.1Exterior Opening Analysis Building A GarageA1-55.2Exterior Opening Analysis Building A GarageA1-56Exterior Opening Analysis Building B GarageA1-57.1Exterior Opening Analysis Building B GarageA1-57.2Exterior Opening Analysis Building B GarageA2-11SBuilding A First Level Slab PlanA2-11Building A First Level Floor PlanA2-12SBuilding A Second Level Slab PlanA2-12Building A Second Level Floor PlanA2-13SBuilding A Third Level Slab PlanA2-13Building A Third Level Floor PlanA2-14Building A Fourth Level Floor PlanA2-15Building A Fifth Level Floor PlanA2-16Building A Sixth Level Floor PlanA2-17Building A Seventh Level Floor PlanA2-18Building A Roof PlanA2-19.1Building A First Level RCPA2-19.2Building A Second Level RCPA2-19.3Building A Third Level RCPA2-19.4Building A Fourth Level RCPA2-19.5Building A Fifth Level RCPA2-19.6Building A Sixth Level RCPA2-19.7Building A Seventh Level RCPA2-20Building A North & East Exterior ElevationsA2-21Building A South & West Exterior ElevationsA2-22Building A Courtyard ElevationsA2-30Building A SectionsA2-31Building A SectionsA2-32Building A SectionsA2-40Building A Wall SectionsA2-41Building A Wall SectionsA2-42Building A Wall SectionsA2-43Building A Wall SectionsA2-44BUILDING A WALL SECTIONSA2-45BUILDING A WALL SECTIONSA2-51SBuilding B First Level Slab PlanA2-51Building B First Level Floor PlanA2-52Building B Second Level Floor PlanA2-53Building B Third Level Floor PlanA2-54Building B Fourth Level Floor PlanA2-55Building B Fifth Level Floor PlanA2-56Building B Roof PlanA2-57.1Building B First Level RCPA2-57.2Building B Second Level RCPA2-57.3Building B Third Level RCPA2-57.4Building B Fourth Level RCPA2-57.5Building B Fifth Level RCPA2-60Building B North & East Exterior ElevationsA2-61Building B South & West Exterior ElevationsA2-62Building B Courtyard ElevationsA2-70Building B SectionsA2-80Building B Wall SectionsA2-81Building B Wall SectionsA2-82Building B Wall SectionA2-83Building B wall SectionsA5-01Unit 0.1 Plans and Interior ElevationsA5-02Unit 0.2 Plans and Interior ElevationsA5-03Unit 0.3 Plans and Interior ElevationsA5-11Unit 1.1 Plans and Interior ElevationsA5-12Unit 1.1 Plan VariationsA5-13Unit 1.2 Plans and Interior ElevationsA5-14Unit 1.3 Plans and Interior ElevationsA5-21Unit 2.1 Plans and Interior ElevationsA5-22Unit 2.1 Plans and VariationsA5-23Unit 2.1 Plan VariationsA5-25Unit 2.2 Plans and Interior ElevationsA5-26Unit 2.2 Plan VariationsA5-27Unit 2.2 Plan VariationsA5-28Unit 2.2 Plan VariationsA5-30Unit 2.3 Plans and Interior ElevationsA5-31Unit 2.3 Plan VariationsA5-32Unit 2.4 Plans and Interior ElevationsA5-34Unit 2.5 Plans, Variation and Interior ElevationsA5-35Unit 2.6 Plans and Interior ElevationsA5-36Unit 3.1 Plans and Interior ElevationsA5-37Unit 3.2 Plans and Interior ElevationsA5-38Unit 3.2 Plans and VariationA5-39Unit 3.3 PlansA5-41Unit 4.1 Plans and Interior ElevationsA5-42Unit 4.1 Plan and VariationsA5-43Unit 4.1 Plans and VariationsA5-44Unit 4.1 Plan VariationsA5-45Unit 4.2 PlansA5-46Unit 4.2 Plan and Interior ElevationsA5-50Restaurant Enlarged Plan - Level 1A5-51Restaurant, Pool Equipment Enlarged Plan - Level 2A5-52Retail Enlarged Plan - Level 1A5-53Retail and Tenant Storage Enlarged Plan - Level 2A5-54Leasing & Amenity Enlarged Plan - Level 1A5-55Leasing & Amenity Enlarged Plan - Level 2A5-56Leasing & Amenity Enlarged Reflected Ceiling PlanA5-57Leasing & Amenity Interior SectionsA5-60AClubroom Enlarged Plan - Level 3A5-60BClubroom Enlarged Plan - Level 4A5-61Clubroom Enlarged Reflected Ceiling PlanA5-62Clubroom Enlarged Plan - Primary Structural FrameA5-63Clubroom SectionsA5-64Roof Deck Enlarged PlanA5-64AROOF DECK SHADE TRELLIS DETAILA5-65Mailroom Enlarged Plan & Interior ElevationsA5-66Mailroom Enlarged Plan & Interior ElevationsA5-67Pool Deck AccessibilityA5-68Building B Courtyard AccessibilityA5-70Stair A1 Enlarged PlansA5-71Stair A1 SectionA5-72Stair A2 Enlarged PlansA5-73Stair A2 & A3 SectionA5-74Stair A3 Enlarged PlansA5-75Stair A4 Enlarged PlansA5-76Stair A4 Enlarged PlansA5-77Stair A4 SectionA5-78Stair B1 Enlarged PlansA5-79Stair B1 SectionA5-80Stair B2 Enlarged PlansA5-81Stair B2 SectionA5-82Stair B3 Enlarged PlansA5-83Stair B3 & B4 SectionA5-84Stair B4 Enlarged PlansA5-85Building A Electrical Room Plan, Sections & RampA5-86Building B Electrical Rm Plan, Sections & Courtyard RampA5-87Building A Ramp PlansA5-88Building A Ramp PlansA5-89Building B Ramp PlansA5-90Elevators A1 & A2 PlansA5-91Elevators A1 & A2 SectionsA5-92Elevators B1 & B2 PlansA5-93Elevators B1 & B2 SectionsA5-94Building A Trash Room PlansA5-95Building A Trash Chute SectionsA5-96Building A Trash Chute SectionsA5-97Building B Trash Room PlansA5-98Building B Trash Chute SectionsA5-99BUILDING B TRASH CHUTE SECTIONSA6-01COMMON AREA INTERIOR ELEVATIONSA6-02COMMON AREA INTERIOR ELEVATIONSA7-00Dwelling Unit Door ScheduleA7-10Building A Door ScheduleA7-20Building B Door ScheduleA7-30Vinyl Window ScheduleA7-40Storefront ScheduleA7-50Finish ScheduleA7-51FINISH SCHEDULEA7-52FINISH SCHEDULEAD-01ACCESSIBLE ROUTES, PARKING NOTES AND DETAILSAD-02COMMON & PUBLIC AREA ACCESSIBILITY NOTES & DETAILSAD-02.1COMMON & PUBLIC AREA ACCESSIBILITY NOTES & DETAILS (2)AD-03DWELLING UNIT ACCESSIBILITY DETAILSAD-04ELEVATOR DETAILSAD-20FIRE ASSEMBLY PENETRATION KEY PLANAD-20.1FIRE PENETRATION DETAILSAD-20.2ACOUSTICAL ISOLATION DETAILSAD-20.3FIRE STOP SYSTEMSAD-21FIRE-RATED FLOOR-CEILING ASSEMBLIESAD-21FIRE-RATED FLOOR-CEILING ASSEMBLIES (cont.)AD-22FIRE-RATED INTERIOR WALL ASSEMBLIESAD-22FIRE-RATED INTERIOR WALL ASSEMBLIES (cont.)AD-22.11-HOUR FIRE PARTITION DETAILSAD-232-HOUR FIRE BARRIER DETAILSAD-24FIRE-RATED EXTERIOR WALL DETAILSAD-24.1FIRE-RATED EXTERIOR WALL DETAILS (cont.)AD-253-HR RATED FIRE WALL DETAILSAD-25ADOUBLE 2-HR FIREWALL PER NFPA 221 IN LIEU OF 3-HR FIRE WALLAD-263-HOUR FIRE BARRIER AT GREASE SHAFT DETAILSAD-27TYPICAL CORRIDOR AND TILT-UP WALL AT GARAGEAD-28FIRE-RATED PRIMARY STRUCTURAL FRAME DETAILSAD-29FIRE-RATED PRIMARY STRUCTURAL FRAME DETAILSAD-31GARAGE DETAILSAD-31.1GARAGE DETAILSAD-32SLAB ON GRADE DETAILSAD-33EXPANSION JOINT DETAILSAD-41ELEVATED SLAB DETAILSAD-41.1EXTERIOR IMPERVIOUS SURFACE (CON-DEK)AD-45BELOW GRADE WATERPROOFING DETAILSAD-51.0EXTERIOR WALL FLASHING DETAILS AT STUCCOAD-51.1EXTERIOR WALL FLASHING DETAILS AT STUCCOAD-52.0EXTERIOR DOOR FLASHING DETAILS AT STUCCOAD-52.1DOOR FLASHINIG DETAILSAD-53WINDOW DETAILS (FLUSH CONDITION)AD-54WINDOW DETAILS (RECESSED CONDITION)AD-54.1WINDOW DETAILSAD-55EXTERIOR IMPERVIOUS SURFACE (PLI-DEK)AD-55.1POST & GUARDRAIL DETAILSAD-56EXTERIOR DECK WITH HARDROCK CONCRETE TOPPINGAD-61.0TPO ROOFING DETAILSAD-61.1TPO ROOFING DETAILSAD-61.2CONCRETE FLAT TILE ROOF DETAILSAD-71INTERIOR STAIR DETAILS (STEEL STRINGER & PRE-CAST)AD-71.1INTERIOR STAIR DETAILS (WOOD)AD-71.2STAIR DETAILSAD-81STOREFRONT DETAILS (Flush Conditions)AD-82STOREFRONT DETAILS (Recessed Conditions)AD-82.1STOREFRONT DETAILSAD-82.2STOREFRONT DETAILSAD-83CANOPY DETAILSAD-84MISCELLANEOUS DETAILSAD-84.1MISCELLANEOUS DETAILSAD-91CEILING DETAILSAD-95Concrete Roof Tiles IAPMO Uniform Evaluation Services ER-1900AD-96EverGuard TPO UL ER1306-01AD-97EverGuard TPO UL ER1306-01AD-98EverGuard TPO UL ER1306-01AD-99EverGuard TPO UL ER1306-0111-30-2022THIRD OCFA SUBMITTAL03-14-2023FOURTH BUILDING DEPARTMENT SUBMITTAL12.ERRCSADCR APPROVAL LETTERTHE SUBMITTED BUILDING PLANS SETS SHALL INCLUDE A NOTE THAT THE INTERIOROF THE PARKING AREAS SHALL BE PAINTED WHITE AND CONTAIN A SUFFICIENTLIGHTING FOR SECURITY AND SAFETY.13.INTERIOR DESIGNLicense Stamp
|