My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 30 - 4th and Mortimer Mixed-Use Development Project Located at 409 and 509 East Fourth Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
11/19/2024
>
Item 30 - 4th and Mortimer Mixed-Use Development Project Located at 409 and 509 East Fourth Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 3:06:42 PM
Creation date
11/15/2024 9:08:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
30
Date
11/19/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPSPELECLVELECLV <br />ELECLVELECLV <br />LV <br />ELECLVELECLVELECELEC <br />LVLVELECLVELECLVELECLVELECUPUPUPUPRWUP 5%UP 5%VANUP 5%UP 2%GPARCELñ <br />ññ <br />ññññ <br />ñññññFEC <br />FECFECUSPSUP 3% <br />3.5%4.0%ELECTRICALROOMSTAIR B1STAIR B2STAIR B3STAIR B4ELEV. B1ELEV. B2ELECLVUPDN 6.5%UPDNUPUPDN 6.07%UPGGDN 8% <br />DN 4.67% <br />ELEC <br />LV <br />DN 4.67%DN 4.67%DN 4.67%UPS-2 PARKING GARAGETYPE IA CONSTRUCTIONUNLIMITED AREAALLOWEDAREA "B1"3185 SQ. FT.AREA "B2"9794 SQ. FT.AREA "B3"7328 SQ. FT.R-2SPSPELECLVELECLV <br />ELECLVELECLV <br />LV <br />ELECLVELECLVELECELEC <br />LVLVELECLVELECRW G UP 5%RAMP UP93' (RUN) (5% SLOPE) = 4.65' (RISE)UP 3.5%DN 5%OPEN TO BELOWVANUP 5%UPDNUPEVEVEVEVEV <br />EV EVEVñ <br />ññ <br />ññññ <br />ññññ <br />ñFEC <br />FECFECFECEVEVEVEV EV <br />EVEVEVEVEVEVEVEVELECLVLVELECLVELECSTAIR B1STAIR B2STAIR B3STAIR B4ELEV. B1ELEV. B2UPDNLV <br />ELEC <br />UPUPDNDNUPS-2 PARKING GARAGETYPE IA CONSTRUCTIONUNLIMITED AREAALLOWEDAREA "B1"3185 SQ. FT.AREA "B2"9795 SQ. FT.AREA "B3"7522 SQ. FT.R-2SPSPELECLVELECLV <br />ELECLVELECLV <br />LV <br />ELECLVELECLVELECLV <br />ELEC <br />ELEC <br />LVLVELECLVELECRW G UP 5%UP 5%UP 3.5%DN 5%UPDNUPEVEVñ <br />ññ <br />ññññ <br />ññññ <br />ñFEC <br />FECFECFECEVEVEVEVEV <br />EV <br />EVEV EV <br />EVEVEVEVEVEVEVEVEVELECLVLVELECLVELECSTAIR B1STAIR B2STAIR B3STAIR B4ELEV. B1ELEV. B2UPDNDNUPUPUPDNS-2 PARKING GARAGETYPE IA CONSTRUCTIONUNLIMITED AREAALLOWEDAREA "B1"3185 SQ. FT.AREA "B2"9836 SQ. FT.AREA "B3"7522 SQ. FT.R-2SPSPELECLVELECLV <br />ELECLVELECLV <br />LV <br />ELECLVELECLVELECLV <br />ELEC <br />ELEC <br />LVLVELECLVELECELECLVLVELECLVELECSTAIR B1STAIR B2STAIR B3STAIR B4ELEV. B1ELEV. B2UPDNDNUPUPUPDNDNUPRW G RAMP UP93' (RUN) (5% SLOPE) = 4.65' (RISE)UP 3.5%DN 5%ñ <br />ññ <br />ññññññ <br />ñFEC <br />FECS-2 PARKING GARAGETYPE IA CONSTRUCTIONUNLIMITED AREAALLOWEDAREA "B1"3185 SQ. FT.AREA "B2"9836 SQ. FT.AREA "B3"7522 SQ. FT.R-2SPSPELECLVELECLVELECLVELECLVLVELEC LVELECLVELECLV ELEC ELEC LVLVELECLVELECELECLVLVELECLVELECRW G STAIR B1STAIR B3STAIR B4ELEV. B1ELEV. B2DNDNDNAREA "B1"3185 SQ. FT.AREA "B2"9836 SQ. FT.AREA "B3"7522 SQ. FT.R-2TYPE IA CONSTRUCTIONUNLIMITED AREAALLOWEDCCOPYRIGHTIt is the clients responsibility prior to or during construction to notify the architect in writingof any perceived errors or omissions in the plans and specifications of which a contractorthoroughly knowledgeable with the building codes and methods of construction shouldreasonably be aware. Written instructions addressing such perceived errors or omissionsshall be received from the architect prior to the client or clients subcontractors proceedingwith the work. The client will be responsible for any defects in construction if theseprocedures are not followed.Architecture + Planning17911 Von Karman Ave.Suite 200Irvine, CA 92614ktgy.com949.851.2133License StampProject Contact:Email:Principal: Project Designer:Project Director:KTGY Project No:2017-0934Debbie Hollanddholland@ktgy.comWil WongD. SchoolmeesterDebbie HollandDeveloperPHONE NO.4199 CAMPUS DRIVEIRVINE, CA 92612(714) 342-2502415 & 515 E. 4TH STREET, SANTA ANA, CA 92701 <br />4TH AND MORTIMERNo.Date Description06-21-2023 FIFTH BUILDING DEPARTMENT SUBMITTALA03-21-23ADDENDUM ABUILDING BALLOWABLE AREACALCULATIONSA0-03BSCALE:11/32"=1'-0"BUILDING B LEVEL 1SCALE:21/32"=1'-0"BUILDING B LEVEL 2SCALE:31/32"=1'-0"BUILDING B LEVEL 3SCALE:41/32"=1'-0"BUILDING B LEVEL 4SCALE:51/32"=1'-0"BUILDING B LEVEL 5SCALE:61/32"=1'-0"NOT USED06-21-23
The URL can be used to link to this page
Your browser does not support the video tag.