My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 30 - 4th and Mortimer Mixed-Use Development Project Located at 409 and 509 East Fourth Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
11/19/2024
>
Item 30 - 4th and Mortimer Mixed-Use Development Project Located at 409 and 509 East Fourth Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 3:06:42 PM
Creation date
11/15/2024 9:08:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
30
Date
11/19/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19AD-211 OR 2-HOUR CMU WALL <br />EXTERIOR CMU/CONC WALL 1 OR 2-HOUR EXT WALL 1 OR 2-HOUR EXT WALL <br />1-HOUR INT WALL 1-HOUR INT WALL 1-HOUR INT WALL <br />1-HOUR INT WALL 1-HOUR INT WALL 1-HOUR INT WALL <br />1-HOUR FLOOR ASSEMBLY1-HOUR FLOOR ASSEMBLY3-HOUR HORIZONTAL ASSEMBLY1-HOUR ROOF ASSEMBLY10AD-20.116AD-20.16AD-20.16AD-20.3ONE METALLIC THROUGH PENETRANT - TUB DRAIN8AD-20.13AD-20.12AD-20.1ELECTRICAL BOX - GYPSUM WALL13AD-20.314AD-20.3BATHTUB NON-METALLIC THROUGH PENETRANT - WOOD FLOOR10AD-20.3ONE METALLIC DUCT THROUGH PENETRANT - CONCRETE/CMU WALL4AD-20.3ONE NON-METALLIC THROUGH PENETRANT - WOOD FLOORONE NON-METALLIC THROUGH PENETRANT - CONCRETE FLOORONE METALLIC THROUGH PENETRANT - GYPSUM WALLONE METALLIC THROUGH PENETRANT - WOOD JOIST FLOORONE NON-METALLIC THROUGH PENETRANT - GYPSUM WALLONE METALLIC THROUGH PENETRANT - GYPSUM WALLMULTIPLE METALLIC THROUGH PENETRANTS - CONCRETE FLOOR / CMU WALL18AD-20.3ONE METALLIC THROUGH PENETRANT - WOOD FLOOR AT WATER CLOSET17AD-20.3UNUSED HOLE PLUG4AD-20.11-HOUR INT WALL <br />1-HOUR INT WALL <br />SHEET METALDRYER VENTAIR HANDLEREXHFANEXHFANSOFFITSHEET METALDRYER VENTREG2 <br />MULTIPLE METALLIC OR NON-METALLIC THROUGH PENETRANTS - CONCRETE FLOORF RATING: 3 HOUR (UL SYSTEM C-AJ-8093)T RATING: 3 HOUR (PER AMMC)PENETRANTS: 1 OR MORE METALLIC OR NON-METTALIC PENETRANTS DESCRIBED INUL SYSTEM C-AJ-809312AD-20.11MEMBRANE PENETRATIONS BY STEEL, FEROUS OR COPPER CONDUITS, PIPES, TUBES ORVENTS WHERE THE ANNULAR SPACE IS PROTECTED IN ACCORDDANCE WITH SECTION 713.4.1.1OR TO PREVENT THE PASSAGE OF FLAME AND PRODUCTS OF COMBUSTION. THE AGGREGATEAREA OF OPENINGS THROUGHT THE MEMBRANE SHALL NOT EXCEED 100 SQ. IN. IN ANY 100 SQ.FT. OF CEILING AREA IN ASSEMBLIES TESTED WITHOUT PENETRATIONSKEYNOTES2WHERE DUCTS PENETRATE FIRE-RESISTANCE-RATED WALL FROM A NON-RATED SOFFIT TO AROOM: PROVIDE 5/8" TYPE-X GYP BD AT THE TOP, BOTTOM AND BOTH SIDES OF THE OPENING1-HOUR INT WALL 11. FOR PIPE / WIRE / CABLE PENETRATIONS - REFER TO DETAILS 2, 3, 4, 6, 7, 8, 10, 11, 12, 16/AD-20.NOTES19AD-20.1VENT PENETRATION AT EXTERIOR WALLONE NON-METALLIC THROUGH PENETRANT IN WALL111SHEET METALDUCTSHEET METALDUCT THROUGH ROOFSHEET METALDUCTTIE-DOWN PENETRANTF RATING: 1 HOURT RATING: 0 HOUR1-HR FIRESTOPPING BY 3M AT SOLE AND TOP PLATESOFFIT11AD-20.3ONE METALLIC DUCT THROUGH PENETRANT - GYPSUM WALL3AD-20.11 OR 2-HOUR EXT WALL <br />2-HOUR EXT WALL2-HOUR EXT WALL2-HOUR EXT WALL2-HOUR EXT WALL <br />3-HOUR EXT WALL 3-HOUR EXT WALL 3-HOUR EXT WALL 3-HOUR EXT WALL <br />DOES NOT OCCUR IN 3-HR WALLDOES NOT OCCUR IN 3-HR WALLMULTIPLE PENETRATIONS THROUGH 3-HR CONCRETE OR BLOCK WALL8AD-20.3PENETRATIONS THROUGH 2-HR EXT. WALL10.11.16AD-20.118AD-22ELECTRICAL BOXCCOPYRIGHTIt is the clients responsibility prior to or during construction to notify the architect in writingof any perceived errors or omissions in the plans and specifications of which a contractorthoroughly knowledgeable with the building codes and methods of construction shouldreasonably be aware. Written instructions addressing such perceived errors or omissionsshall be received from the architect prior to the client or clients subcontractors proceedingwith the work. The client will be responsible for any defects in construction if theseprocedures are not followed.Architecture + Planning17911 Von Karman Ave.Suite 200Irvine, CA 92614ktgy.com949.851.2133License StampProject Contact:Email:Principal: Project Designer:Project Director:KTGY Project No:2017-0934Debbie Hollanddholland@ktgy.comWil WongD. SchoolmeesterDebbie HollandDeveloperPHONE NO.4199 CAMPUS DRIVEIRVINE, CA 92612(714) 342-2502415 & 515 E. 4TH STREET, SANTA ANA, CA 92701 <br />4TH AND MORTIMERNo.Date Description06-21-2023 FIFTH BUILDING DEPARTMENT SUBMITTALA03-21-23ADDENDUM AFIRE ASSEMBLYPENETRATION KEYPLANAD-20SCALE:43/8"=1'-0"TYPICAL FIRE-RESISTANCE RATED PENETRATIONS06-21-23
The URL can be used to link to this page
Your browser does not support the video tag.