Laserfiche WebLink
216511101615141712VENT THROUGH ROOFNON-RATED ATTIC ACCESSRAKE TO WALL DIVERTER2X FASCIAROOF UNDERLAYMENTLAP UP WALLEDGE METAL26 GA GALV MTL ROOFTO WALL FLASHING PANNO PENETRATIONS TOOCCUR IN PANEXTEND PAN 2" PASTEAVE CUT, TUCK BACKUNDER PAN AND SEALWEEP SCREED'J' METALNOTES: GUTTER NOT SHOWN FOR CLARITYGYP. BD. CEILING1/2" PLYWOODGYP. BD. (THICKNESS TO MATCHCEILING GYP. BD.) ATTACH TO1/2" PLYWOOD3/4"3/4"PROVIDE GYP. BD.J-MOULD AT PERIMETEROF GYP. BD. PANEL5/8" GYP. BD. AROUNDPERIMETER OF OPENINGOPENING SIZEPER PLANPROVIDE GYP. BD.J-MOULD AT PERIMETEROF OPENING8"201819ROOF TILE-EAVE ROOF TILE-TIGHT RAKERIDGE OR HIP TILENAILER PER TILE MFG.ROOF TILE - SEE ROOF PLAN -INSTALL PER MFGR.ROOF UNDERLAYMENTUNDER AND OVER NAILERROOF SHEATHING PER STURCTURALROOF FRAMINGNOTES: 1. REFER TO TILE MFGR. SPECIFICATIONS FOR INSTALLATION OF TILE REQUIREMENTS 2. PROVIDE NAILING AND WIND CLIPS PER MFGRS. INSTALLATIONROOF TILE-RIDGE/HIPROOF TILE-VALLEYNOTE: NO PENETRATIONS TO OCCUR THRU VALLEY FLASHING36" M <br />IN <br />. <br />1/8" <br />CRIM <br />P <br />26 GA. GALV. MTL. VALLEYFLASHING. INSTALL PERROOFING MFGR. LAP ANYJOINTS 6" MIN & SEAL.ROOF TILE - SEE ROOF PLAN - NOFASTENERS IN VALLEY FLASHINGROOF SHEATHING & FRAMINGPER STRUCTURAL DRAWINGSROOF UNDERLAYMENT UNDERVALLEY FLASHING WEAVEACROSS VALLEY MIN. 12" EACHSIDE36" WIDE 72 POUND UNDERLAYMENTCENTERED ALONG LENGTH OFVALLEY2X3 BARGE BOARD2X2 SPACEREDGE DRIP METALSEAMLESS ALUMINUMPREFINISHED 4" OGEE GUTTERWHERE OCCURS, SEE ROOFPLAN2x BLOCKINGW.R.B.SHEATHING MAY OCCURFRAMING PER STRUCTURALTRUSS HEEL MAY VARY SEE ROOFPLAN/ ELEVATIONSROOF SHEATHING PER STRUCTURALROOF UNDERLAYMENT LAP OVEREAVE RISERBATTENS PER TILE MFGR.EAVE RISER WITH WEEP HOLESPER ROOF TILE MFGR.STARTER BOARDPER ROOF PLAN3-COAT STUCCO SYSTEMO/ W.R.B.ROOF TILE - SEE ROOF PLAN -INSTALL PER MFGR.ROOF TILE - SEE ROOF PLANINSTALL PER MFGR.BATTENS PER TILE MFGR.PROVIDE 2X4 CRIPPLERS @ 24"O.C. FOR LATH SUPPORT ATRAKE ENDS OR GABLE ENDTRUSS2X4 FLAT AT 24" O.C.RETURN (2) TRUSS BAYSROOF UNDERLAYMENTLAP DOWN BARGE BOARD 1"ROOF SHEATHING PERSTRUCTURALEDGE METALW.R.B.SHEATHING MAY OCCURFRAMING PER STRUCTURALPER ROOF PLAN3-COAT STUCCO SYSTEMO/ W.R.B.REFER TO DETAILFOR ALL INFO.NOT SHOWN HERE.3-ROOF TILE-RAKE2x4 FASCIA BOARD33x8 BARGE BOARD7RADIANTBARRIERRADIANT BARRIER22" X 30" HM. ACCESS PANEL <br />WITH PLYCO W-1424 LOUVER <br />6"ROOF TRUSSES @ 24" O.C.REFER TO STRUCTURAL18 GA. GALV. MTL. FLASHING,PAINTEDSEALANT1 1/2" H.M. ACCESS PANELPROVIDE PERIMETERWEATHER SEAL GASKETSWITH NON-COMBUSTIBLE METALEMBER RESISTANT MESHSCREEN -1/6" TO 1/8" MAX(2) 2X BLOCKING @ ACCESPANEL FRAMEHEAT WELDED TPO MEMBRANE(2) 2X BLOCKING @ ACCESS PANELFRAME CONDITIONROOFING AND ROOF ASSEMBLY PERPLAN AND DETAILMORTAR FILL18 GA. GALV. MTL. SILLFLASHING, PAINTEDTPO ROOF MEMBRANE O/ 1/4" DENS DECKO/ 1" THICK APPROVED RIGID INSULATIONO/ PLYWOOD SHEATHINGATTIC ACCESS PANELPIANO HINGELATCH W/ TURN LOCK"PLYCO" NO.W-1424 VENT .LOUVER INSERT22" x 30" H.M. ACCESSPANELATTIC VENT LOUVER WITHNON-COMBUSTIBLE METALMESH SCREEN -1/6" TO 1/8"MAXATTIC ACCESS DOOR3AD-52SIM.TPO MEMBRANE3-COAT STUCCO SYSTEMO/ W.R.B.SEALANT & BACKER RODMCBGAL. MET. CAP FLSH'G OVER HIGH TEMP S.A.F.1X6 FIRE-RETARDANT TREATEDT&G WOOD STARTER BOARDS ATEXPOSED EAVES, FULL BODYSTAINEDRAKE SEAL - INSTALL PER MFR.SPECS.4'S' TILE-ROOF TO WALLROOF UNDERLAYMENT LAP UP WALL8" MIN WEATHERBOARD LAP W/ FIELDROOF FELT3-COAT STUCCO SYSTEM O/ W.R.B.2X BACKING AT GALV. MTL. FLASHINGBATTENS PER TILE MFGR.CONCRETE 'S' ROOF TILEINSTALL PER MFGR.ROOF SHEATHING &FRAMING PER STRUCTSHEATHING MAY OCCUR'S' TILE-RAKE TO WALL3-COAT STUCCO SYSTEM O/ W.R.B.3"PER TILE MFGR. <br />(5 1/2")2X BACKING AT GALV. MTL. FLASHINGCONCRETE 'S' ROOF TILEINSTALL PER MFGR. (NO NAILPENETRATIONS INTO FLASHING PAN)SHEATHING MAY OCCURWEEP SCREED 'J' METAL O/ Z BAR26 GA. GALV. MTL. "Z" BAR FLASHINGO/ S.A.F. PRIME & PAINT TO MATCHSTUCCOROOF UNDERLAYMENT LAP UP WALL 8" MIN.BATTEN EXTENDERS PER TILE MFGR DO NOTPENETRATE FLASHING PANROOF AND WALL FRAMING PER STRUCT.ROOF SHEATHING26 GA. GALV. MTL. ROOF TO RAKE WALLFLASHING PAN. NO PENETRATIONS TOOCCUR THROUGH FLASHING PAN1X6 BACKER BOARD3"MIN.3"PER TILE MFGR.26 GA. GALV. MTL. "Z" BAR FLASHINGO/ S.A.F. PRIME & PAINT TO MATCHSIDINGWEEP SCREED 'J' METAL O/ Z BAR1X6 BACKER BOARDCONCRETE FLAT TILEROOF DETAILSAD-61.2CCOPYRIGHTIt is the clients responsibility prior to or during construction to notify the architect in writingof any perceived errors or omissions in the plans and specifications of which a contractorthoroughly knowledgeable with the building codes and methods of construction shouldreasonably be aware. Written instructions addressing such perceived errors or omissionsshall be received from the architect prior to the client or clients subcontractors proceedingwith the work. The client will be responsible for any defects in construction if theseprocedures are not followed.Architecture + Planning17911 Von Karman Ave.Suite 200Irvine, CA 92614ktgy.com949.851.2133License StampProject Contact:Email:Principal: Project Designer:Project Director:KTGY Project No:2017-0934Debbie Hollanddholland@ktgy.comWil WongD. SchoolmeesterDebbie HollandDeveloperPHONE NO.4199 CAMPUS DRIVEIRVINE, CA 92612(714) 342-2502415 & 515 E. 4TH STREET, SANTA ANA, CA 92701 <br />4TH AND MORTIMERNo.Date Description06-21-2023 FIFTH BUILDING DEPARTMENT SUBMITTALA03-21-23ADDENDUM A06-21-23