Laserfiche WebLink
WRBWEATHER RESISTIVE BARRIERMINIMUM 2-LAYERS FORTIFIBER 60 MINUTE SUPER JUMBO TEXSELF ADHERED FLASHINGFORTIFIBER FORTIFLASH BUTYL 30 MIL AT SILL,20 MIL AT HEAD AND JAMBS U.N.O.SAFBACKER ROD& SEALANTGENERAL NOTES1.VERIFY WINDOW INSTALLATION WITH WINDOW MANUFACTURER'S WRITTEN INSTRUCTIONS. PROVIDE FIELD MOCKUP OF WINDOW INSTALLATION FORAPPROVAL BY OWNER.2.UNLESS SUPERSEDED BY WINDOW MANUFACTURER, THE ROUGH OPENING SHOULD BE 1" GREATER IN WIDTH AND HEIGHT THAN THE NET FRAME SIZEOF THE WINDOW.3.VERIFY ROUGH OPENING IS SQUARE, PLUMB, AND LEVEL. WINDOW SILL TO BE SET UPON LEVEL FRAMING SILL WITH CONTINUOUS SUPPORT.4.SUBSTRATES SHALL BE CLEAN , DRY, PRIMED AS REQUIRED, AND UNIFORM/SMOOTH PRIOR TO FLASHING APPLICATION.5.WANED LUMBER WILL NOT BE USED @ ROUGH OPENINGS LOCATIONS.6.FIELD VERIFY ALL DIMENSIONS PRIOR TO CUTTING AND INSTALLING FLASHING COMPONENTS. VERIFY MANUFACTURER REQUIREMENTS.7.PROVIDE MINIMUM 12" SOLID WOOD BACKING OR SHEATHING AT ALL SIDES OF OPENING TO SECURE FLASHING.8.ADHERE SELF ADHERED FLASHING TO CLEAN DUST FREE BACKING TYPICAL.9.USE CHEMICALLY COMPATIBLE PRIMERS, WRB, AND SEALANT AS REQUIRED BY MANUFACTURER.10.GSM TO BE MIN. 26 GA G90 GALVANIZED U.N.O.11.PROVIDE GSM SILL PAN AT STOREFRONT TO FLOOR CONDITION - SEE DOOR SILL PAN DETAILS FOR SIM. INFORMATIONLEGEND AND NOTES (APPLIES TO ENTIRE SHEET)NOFNAIL ON FLASHINGFORTIFIBER MOISTOP NEXTBIBB12" WIDE NOF BIBB -EXTEND 12" BEYONDR.O. EA. SIDE"A" PIECEINSTALL TLS LABS 'A' PIECE ATCORNERS - FASTEN/SPLIT ASREQUIRED TO ACCOMMODATESHELF SLOPE TRANSITION PERMANUF. RECOMMENDATIONS -SIZE 'A' PIECE TO MATCH RECESSR.O. DEPTH (PROVIDE SAF BRIDGEPIECE TO ACCOMMODATE DEEPRECESSES AS REQUIRED)SILL SAF MEMBRANE30 MIL SILL SAF -COMPLETELY COVER R.O.SILL; RUN PAST R.O. 6" MIN.EA. SIDE TO COVER 'A'PIECES; RUN 4" MIN.DOWNLEGHEAD END DAMSHEAD SAFHEAD SAF - COMPLETELYCOVER R.O. HEAD - EXTEND1" PAST JAMB SAF EA. SIDE;RUN 12" MIN. UPLEG ABOVEJAMB SAFJAMB SAFJAMB SAF - COMPLETELYCOVER R.O. JAMB - EXTENDTO 1" ABOVE BOTTOM OFNOF SILL BIBB AND 11"BEYOND R.O. HEAD - RUN 4"MIN. SIDELEGSTOREFRONTCASING BEADINSTALL J- METAL CASINGBEAD (3-1/2" LEG) AT HEAD,JAMBS, AND SILL - MAINTAINMIN. 3/8" SEALANT JOINTBETWEEN CASING BEAD ANDSTORFRONTJAMB SAFINSTALL JAMB SAF O/ CASINGBEAD LEG - ALIGN BOTTOMWITH BASE JAMB SAF ANDEXTEND TO 1" BELOW TOPOF HEAD SAF - RUN 9" MIN.SIDELEGINSTALL CONTINUOUSBACKER ROD & SEALANTAT SEALANT GAPSEALANTINSTALL 4" CEMCO #12SOFFIT DRIP FLASHING O/EDGE OF HEAD SAF - RUNDRIP 1" PAST OPENING ATEA. SIDE OF JAMB - RUNFLANGE 6" PAST DRIP ONEACH SIDEGSM DRIP FLASHINGINSTALL 12" WIDE SAF O/ GSMHEAD DRIP FLANGE - RUN 1"PAST EDGE OF BASE HEADSAF ON EACH SIDEHEAD DRIP SAFINSTALL WRBSILL END DAMSSILL NOFINSTALL PROTECTION SHEETNOF OVER SILL - RUN 6" MIN.DOWNLEGHEAD SAFINSTALL HEAD SAF O/CASING BEAD - EXTEND 1"PAST JAMB SAF EA. SIDEAND 12" ABOVE OPENING"A" PIECEINSTALL TLS LABS GS 108APIECE AT HEAD CORNERS SETIN MOISTOP SEALANT PERMANUF. RECOMMENDATIONSINSTALL 8" WIDE SAF ENDDAMS - EXTEND TO ENTIRELENGTH OF HEAD - SPLITAND EXTEND ONTO FACEOF WALL 4" MIN.SHEATHING MAY OCCUR3-COAT STUCCO SYSTEMO/ METAL LATH O/ WRBSTUD WALLINTERIOR FINISHSLAPPLIED FOAM TRIMSEE EXT. ELEVATIONS1 : 2BOND BREAKER AT STUCCO TO DRIPFLASHING5-WRB O/ SAF/ O/ GSM SOFFIT DRIPALUM. STOREFRONT SYSTEM -SEE WINDOW FLASHING DETAILWEATHER RESISTIVE BARRIERINTERIOR FINISH3-COAT STUCCO SYSTEM O/METAL LATH O/ WRBAPPLIED FOAM TRIMSEE EXT. ELEVATIONSALUM. STOREFRONT SYSTEM -SEE WINDOW FLASHING DETAIL5-WRB O/ SAF O/ CASING BEAD O/ SAF(J-METAL: 3 1/2" LEG W/ 1" LIP)WRB O/ SAF O/ CASING BEAD O/ SAF -(J-METAL: 3 1/2" LEG W/ 1" LIP)UTILIZE TLS LABS 'A' PIECE AT R.O.SILL/SLOPE TRANSITION TO CREATEEND DAM - FASTEN, FOLD/TUCK ASREQUIRED TO ACCOMMODATESHELF SLOPE, AND SET IN MOISTOPSEALANT PER MANUF.RECOMMENDATIONS - WEATHERBOARD LAP ALL FLASHING PIECES3-COAT STUCCO SYSTEM O/METAL LATH O/ WRBSTUD WALLINTERIOR FINISHAPPLIED FOAM TRIMSEE EXT. ELEVATIONS5-ALUM. STOREFRONT SYSTEM -SEE WINDOW FLASHING DETAILWRB O/ NOF O/ J-METAL CASINGBEAD O/ SAF(J-METAL: 3 1/2" LEG W/ 1" LIP)WRB BIBB BOND BREAKER SHEET O/NOF AND SAFWEATHER BOARD LAP WRB WITHBASE LAYER NOFDBL. 1X SHIMDBL. 1X SHIMDBL. 1X SHIMSLMIN.3 : 12EXTERIOR FACE BACKER ROD & SEALANTINNER SEAL BACKER ROD & SEALANTAT INNER SEAL - MOISTOP SEALANT;AT EXTERIOR FACE - GE SILPRUF 2000 OR DOW CORNING 795 WITH COMPATIBLE OPEN CELL BACKER ROD -3/8" MIN. SEALANT JOINT WIDTHINSTALL STOREFRONTSYSTEM AND INNER BACKERROD & SEALANT PER MANUF.RECOMMENDATIONS -MAINTAIN MIN. 3/8" SEALANTJOINTEXTERIOR FACE BACKER ROD & SEALANTINNER SEAL BACKER ROD & SEALANTEXTERIOR FACE BACKER ROD & SEALANTINNER SEAL BACKER ROD & SEALANTBACK DAM - TLS VINYL CORNERSET IN CONT. BEAD OF SEALANTW/ END JOINTS SEALEDFIREBLOCK PER CODEFIREBLOCK PER CODEFIREBLOCK PER CODESTOREFRONT DETAILS(RECESSEDCONDITIONS)AD-82MAX. 24" RECESSED SF WINDOW HEAD1MAX. 24" RECESS SF WINDOW JAMB (STUCCO)25NOTES43MAX. 24" RECESS SF WINDOW SILL (STUCCO)CCOPYRIGHTIt is the clients responsibility prior to or during construction to notify the architect in writingof any perceived errors or omissions in the plans and specifications of which a contractorthoroughly knowledgeable with the building codes and methods of construction shouldreasonably be aware. Written instructions addressing such perceived errors or omissionsshall be received from the architect prior to the client or clients subcontractors proceedingwith the work. The client will be responsible for any defects in construction if theseprocedures are not followed.Architecture + Planning17911 Von Karman Ave.Suite 200Irvine, CA 92614ktgy.com949.851.2133License StampProject Contact:Email:Principal: Project Designer:Project Director:KTGY Project No:2017-0934Debbie Hollanddholland@ktgy.comWil WongD. SchoolmeesterDebbie HollandDeveloperPHONE NO.4199 CAMPUS DRIVEIRVINE, CA 92612(714) 342-2502415 & 515 E. 4TH STREET, SANTA ANA, CA 92701 <br />4TH AND MORTIMERNo.Date Description06-21-2023 FIFTH BUILDING DEPARTMENT SUBMITTALA03-21-23ADDENDUM ASTOREFRONT FLASHING - MAX 24" RECESSED CONDITION06-21-23