Laserfiche WebLink
2AD-831AD-813AD-83GHEFINNER SEAL BACKER ROD &SEALANTT-24 WALL ASSEMBLYTWO LAYERS OF 58" TYPE 'X'GYPSUM BOARD6X6X14 HSS TUBEALUM. STOREFRONT SYSTEM -SEE WINDOW FLASHING DETAILSAFTWO LAYERS OF 58" TYPE 'X'EXTERIOR GYPSUM SHEATHINGSTUCCO O/ WIRE LATH & WRBEXTERIOR FACE BACKER ROD &SEALANTGFRC PANELWRBTWO LAYERS OF 5/8" TYPE 'X'GYPSUM BOARD ON BOTHSIDEST-24 WALL ASSEMBLY2"1/2" THICK ASPHALT SATURATEDEXPANSION STRIPSHARDSCAPE, SLOPE AWAY 1/4" = 1'-0"BELOW GRADE WATERPROOFING.EXTEND MIN. 6" ABOVE SILLUV PROTECTION GALVANIZED 10"TALL SHEET METALGFRC PANELTHIN BRICK O/ STUCCO O/ WIRELATH & WRBGFRC ATTACHMENTWRB BEHIND ATTACHMENTLOCATIONSTWO LAYERS OF 5/8" TYPE 'X'GYPSUM BOARD ON BOTHSIDEST-24 WALL ASSEMBLYSTOREFRONT DETAILSAD-82.2STOREFRONT DETAILSAD-82.2CCOPYRIGHTIt is the clients responsibility prior to or during construction to notify the architect in writingof any perceived errors or omissions in the plans and specifications of which a contractorthoroughly knowledgeable with the building codes and methods of construction shouldreasonably be aware. Written instructions addressing such perceived errors or omissionsshall be received from the architect prior to the client or clients subcontractors proceedingwith the work. The client will be responsible for any defects in construction if theseprocedures are not followed.Architecture + Planning17911 Von Karman Ave.Suite 200Irvine, CA 92614ktgy.com949.851.2133License StampProject Contact:Email:Principal: Project Designer:Project Director:KTGY Project No:2017-0934Debbie Hollanddholland@ktgy.comWil WongD. SchoolmeesterDebbie HollandDeveloperPHONE NO.4199 CAMPUS DRIVEIRVINE, CA 92612(714) 342-2502415 & 515 E. 4TH STREET, SANTA ANA, CA 92701 <br />4TH AND MORTIMERNo.Date Description06-21-2023 FIFTH BUILDING DEPARTMENT SUBMITTALA03-21-23ADDENDUM A1RETAIL STOREFRONTFGHSTOREFRONT JAMB @STUCCOGFRC PANEL @ SILLGFRC PANEL TO STUCCOTRANSITIONCCOPYRIGHTIt is the clients responsibility prior to or during construction to notify the architect in writingof any perceived errors or omissions in the plans and specifications of which a contractorthoroughly knowledgeable with the building codes and methods of construction shouldreasonably be aware. Written instructions addressing such perceived errors or omissionsshall be received from the architect prior to the client or clients subcontractors proceedingwith the work. The client will be responsible for any defects in construction if theseprocedures are not followed.Architecture + Planning17911 Von Karman Ave.Suite 200Irvine, CA 92614ktgy.com949.851.2133License StampProject Contact:Email:Principal: Project Designer:Project Director:KTGY Project No:2017-0934Debbie Hollanddholland@ktgy.comWil WongD. SchoolmeesterDebbie HollandDeveloperPHONE NO.4199 CAMPUS DRIVEIRVINE, CA 92612(714) 342-2502415 & 515 E. 4TH STREET, SANTA ANA, CA 92701 <br />4TH AND MORTIMERNo.Date Description06-21-2023 FIFTH BUILDING DEPARTMENT SUBMITTALA03-21-23ADDENDUM AAA06-21-23