Laserfiche WebLink
13. Design Details Needed for Replacement of Precast Low Wall per RFI #88.1 (PCO #88 P2). <br /> AGREED COST: $10,000.00 <br /> 14. Mechanical Platform Height Above Finish Roof per RFI #89 (PCO #89). <br /> AGREED COST: $9,092.84 <br /> 15. Clarification on Wall Framing and Electrical Rough-In per RFI #48.1(PCO #93). <br /> AGREED COST: $13,476.85 <br /> 16. Drywall and Ceiling Insulation Removal Per City Direction (PCO #96). <br /> AGREED COST: $20,670.81 <br /> 17. Shoring Plan Design (PCO #100). <br /> AGREED COST: $5,582.50 <br /> 18. Security Cameras Rough-In Requirements per RFI #25 (PCO #102). <br /> AGREED COST: $19,506.51 <br /> 19. Newhope - ASI #5.1 (PCO #104). <br /> AGREED COST: $12,166.21 <br /> 20. Added blocking Detail 10 on Sheet A64.3 per RFI #112 (PCO #105). <br /> AGREED COST: $10,000.00 <br /> 21. Storm Drain Connection Leak per RFI #98 (PCO#106). <br /> AGREED COST: $5,990.76 <br /> 22. Full replacement of the existing glulam per ASI #6 (PCO #107). <br /> AGREED COST: $49,260.51 <br /> 23. Floor Box Cover Replacement in Innovation Center per RFI #128 (PCO #108). <br /> AGREED COST: $2,020.04 <br /> 24. Restroom Accessory Revisions per RFIs #86, #96.1 & #96.2 (PCO#109). <br /> AGREED COST: $1,602.32 <br /> TOTAL AGREED COST: $401,808.30 <br /> Page 2 of 3 <br />