Laserfiche WebLink
Exhibit D: Proposed Structure Improvements("Work Plan") <br /> 424 South Broadway <br /> Item Year Improvement <br /> 1 2024 Exterior paint;traditional Craftsman colors <br /> 2 2024 Repair all original windows to be fully functional as needed through the following: <br /> replace worn/broken window pull ropes, replace broken window panes, repair <br /> exterior wood rot, and weatherproof windows. <br /> 3 2024 New front yard landscaping and walkways in era-appropriate style <br /> 4 2024 Install rain gutters in appropriate style/material <br /> 5 2024 Install yard drainage to move rain away from foundation <br /> 6 2025 Repair siding <br /> 7 2026 Repair cracks in foundation <br /> 8 2026 Seismic retrofit of foundation, brace and bolt <br /> 9 2027 Update electrical systems throughout <br /> 10 2027 Update plumbing system throughout <br /> 11 2028 Reroof with synthetic cedar shakes in keeping with traditional Craftsman style <br /> 12 2032 Termite tenting as preventative maintenance <br /> 13 2033 Sister existing original foundation walls (with a new wall that is located on the <br /> interior of the building adjacent to the original exterior wall)to preserve the <br /> building's structural integrity. <br />