Laserfiche WebLink
EXHIBIT B-FEE PROPOSAL <br /> Cost Sheet <br /> DATE: 8/8/24 PROJ ECT NO: <br /> PROJECT: PO NO. <br /> DESCRIPTION:SHORTDESCRIPTIOI Daily Cost Sheet ESTIMATOR: Bryson Miller <br /> CONTRACTNO: PDX COMPANY:J&L Constructors Inc. <br /> ITE DESCRIPTION Quantity Unit Material Material Price Labor Unit Labor Cost WC/INS Tax 8.75% O&P10% <br /> 1 A Export 0.00 cu yrd $42.00 $0.00 $0.00 $0.00 <br /> 2 A Pipe 0.00 ft. $21 $0.00 $0.00 $0.00 <br /> 3 A Asphalt 0.00 cu yrd $125 $0.00 $0.00 $0.00 <br /> 4 A Grinding 0.00 Ft. $25 $0.00 $0.00 $0.00 <br /> 5 A Fitting 0.00 Each. $65 $0.00 $0.00 $0.00 <br /> 6 A copper 0.00 ft. $8 $0.00 $0.00 $0.00 <br /> 7 B Fuel 0.00 Gal $8.50 $0.00 $0.00 $0.00 <br /> 8 B Consumables 0.00 Day $50.00 $0.00 $0.00 $0.00 <br /> 9 8 Pumping 0.00 Day $1,466.00 $0.00 $0.00 $0.00 <br /> 10 C Office Staff 0.00 Hr $ 55.00 $ - $ - $ - <br /> 11 C Project Manager 0.00 Hr $130.00 $ - $ - $12 C Foreman 0.00 Hr $120.00 $ - $ - $ - <br /> 13 C Operator 0.00 Hr $150.00 $ - $ - $ <br /> 14 C Operator 0.00 Hr $150.00 $ - $ - $ - <br /> 15 C Laborer 0.00 Hr $90.00 $ - $ - $ - <br /> 16 C Laborer 0.00 Hr $90.00 $ - $ - $ - <br /> 17 D Chevy2500 HD 0.00 Hr $15.62 $0.00 $0.00 $ - <br /> 18 D Materials Trailer 0.00 Hr $12.65 $0.00 $0.00 $ - <br /> 19 D 35G Mini Ex 0.00 Hr $30.00 $0.00 $0.00 $ - <br /> 20 D 289D All-terrain 0.00 Hr $37.00 $0.00 $0.00 $ - <br /> 21 D Grinder Attachment 0.00 Hr $25.00 $0.00 $0.00 $22 D Dump Truck 0.00 Hr $37.50 $0.00 $0.00 $ - <br /> 23 D Compaction Wheel 0.00 Hr $11.32 $0.00 $0.00 $ - <br /> 24 D Air Compressor 0.00 Hr $18.75 $0.00 $0.00 $ - <br /> 25 D Air Hammer 0.00 Hr $17.87 $0.00 $0.00 $ - <br /> 26 D Whacker 0.00 Hr $15.52 $0.00 $0.00 $ - <br /> 27 D Dump Trailer*** 0.00 Hr $12.65 $0.00 $0.00 $ - <br /> 28 D Toyota Tool Trk 0.00 Hr $13.98 $0.00 $0.00 $ - <br /> 29 F. -Travel Expenses 0.00 Day $575.00 $0.00 $0.00 $ - <br /> Subtotals This Sheet Carry Forw $- $ 2,633.36 $ - $785.00 $ - $ - $ - $ - <br /> Grand Total <br />